The news story you are looking for has expired. A more recent related article is displayed below.

Sponsored Links

L.B. Foster Awarded $7.6 Million Contract (FSTR)

8/14/2009 - L.B. Foster Company (NASDAQ:FSTR) has been awarded a $7.6 million contract for 115# rail for installation on the A-Train transit project linking Denton and Carrollton, TX. Vice president Greg Lippard said, "Our L.B. Foster Rail Products estimating and project management teams fast-tracked the contract, manufacturing and delivery to meet a critical construction schedule," regarding the shipment of 4599 tons of 1600ft welded rail and 573 tons of 80 ft. stick rail that were delivered to the North Texas Rail Group, a contractor join venture between Herzon Contracting Corporation and Archer Western Contractors on August 1. The first shipment totaling 3066 tons of welded 115# rail was delivered by L.B. Foster's company-owned weld trains and unloaded in early July. Sales manager Dennis Bachtel said, "Coordinating this shipment on our weld trains helped to expedite the delivery and meet the contractors' tight project schedule."

Write to Chip Brian at cbrian@tradethetrend.com

---------------------------------------------------------------------------------------------

SmarTrend analyzes over 5,000 securities simultaneously throughout the trading day and provides its subscribers with trend change alerts in real time. To get a free trial of our trading calls and maximize your trading results, please visit http://www.TradeTheTrend.com.

Get exclusive, actionable insight into how the market is expected to trend prior to market open with our free morning newsletter. Sign up at: http://www.TradeTheTrend.com/signup.html

Copyright (C) 2009 Comtex SmarTrend(R). All rights reserved

News Provided by COMTEX


Related terms: construction, contract, contractor, manufacturing, market, nasdaq, president, products, sales, schedule, securities, texas

Related Articles

Portec Rail Products, Inc. Reports 2009 Third Quarter and Nine Month Operating Results (unaudited) (PR Newswire)
Oct 29, 2009
...22 minutes. prnewswire Portec Rail Products, Inc. Reports 2009 Third Quarter... Press Release Source: Portec Rail Products, Inc. On 6:00 am EDT, Thursday... Print Companies: Portec Rail Products Inc. PITTSBURGH, Oct. 29 /PRNewswire...

Portec Rail Products, Inc. Reports 2009 Third Quarter and Nine Month Operating Results (unaudited)
Oct 29, 2009
...Trucking & Railroad, Earnings Portec Rail Products, Inc. Reports 2009 Third Quarter...PRNewswire-FirstCall/ -- Portec Rail Products, Inc. (Nasdaq: PRPX...return to our industry." Portec Rail Products, Inc., headquartered in Pittsburgh...

Portec Rail Products, Inc. Reports 2009 Third Quarter and Nine Month Operating Results (unaudited)
Oct 29, 2009
Portec Rail Products, Inc. Reports 2009 Third Quarter...Operating Results (unaudited) Portec Rail Products, Inc. (Nasdaq: PRPX) today announced...return to our industry." Portec Rail Products, Inc., headquartered in Pittsburgh...

L.B. Foster Reports Third Quarter Operating Results - Zibb.com
Oct 23, 2009
...encountered at our manufacturing facilities, additional concrete tie defects and the availability of existing and new piling and rail products. There are also no assurances that the Canadian Pacific Railway will proceed with the Powder River Basin project and trigger...