Ads by Google

Xsigo IT Survey Reveals Need for Virtual I/O in Today's Virtualized Data Center

Xsigo Systems, the leader in data center I/O virtualization, today announced the results of a recent technology survey where IT managers from eighty-five blue chip corporations -- including Deloitte & Touche, JPM Chase, Kawasaki, Lockheed Martin, Qwest, Savvis, The World Bank Group, Toyota, Caltrans, and Verizon -- disclosed they have encountered major data center connectivity challenges in the past twelve months.

Xsigo recently hosted a live webcast where 106 IT managers voluntarily gathered to learn more about virtual I/O in the data center setting. Eighty-five of the attendees responded to survey questions regarding server connectivity. Of the respondents, 92% indicated they have deployed virtualization in their data center.

Over fifty percent of respondents reported an I/O-related issue during the previous 12 months. The responses revealed that top areas of concern for those who reported issues included I/O bottlenecks (49%), server lacked needed I/O (44%), and I/O related outages (41%).

IT Managers also revealed the types of server I/O they were currently using. The answers indicate the increasing diversity of connectivity types that IT managers must now contend with, a problem that is becoming more severe as newer standards gain acceptance while co-existing with older connectivity types.

Results of an earlier survey conducted by Xsigo indicated that virtualization users typically need anywhere from 7 to 16 I/O connections per server, a requirement that drives up both cost and complexity. This requirement is expected to grow as users capitalize on the enhanced capabilities of vSphere, the newest generation of VMware virtualization software that adds more I/O bandwidth capacity and also includes new fault tolerance features. Both capabilities increase connectivity requirements, further increasing the quantity and performance loading of server connections.

Xsigo virtual I/O addresses these issues by allowing up to 64 server connections to be accommodated with only one cable to the device. Those connections can be either Fibre Channel, iSCSI, 1G Ethernet, or 10G Ethernet, allowing IT managers to provide all I/O types -- both now and in the future -- with a single, wire-once physical link.

"This survey shows that server I/O is an important problem, especially as virtual machines replace traditional servers," said Jon Toor, Xsigo's vice president of marketing. "More virtual machines mean increased bandwidth requirements and more physical connections per server. Xsigo virtual I/O eliminates the limitations of physical connectivity, allowing IT managers to connect from any server to any network or storage, over any physical transport, without re-cabling, and without having to visit the data center."

About Xsigo

Xsigo Systems, Inc. is the technology leader in data centre I/O Virtualization, helping organizations reduce costs and improve business agility. The Xsigo VP780 I/O Director consolidates server connectivity with a solution that provides unprecedented management simplicity and interoperability with open standards. The privately held company is based in San Jose, CA and funded by Kleiner Perkins, Khosla Ventures, Greylock Partners, and North Bridge Venture Partners. For more information, visit Xsigo at www.xsigo.com.

Image Available: http://www2.marketwire.com/mw/frame_mw?attachid=1092276 Image Available: http://www2.marketwire.com/mw/frame_mw?attachid=1092273

Contact:
Lisa Copass
SteppingOut Communications
925.253.8445


SOURCE: Xsigo Systems

Copyright (C) 2009 Market Wire. All rights reserved

News Provided by COMTEX


Related terms: bandwidth, bank, blue chip, business, communications, Ethernet, marketing, president, software, standards, technology

Related Articles

Xsigo IT Survey Reveals Need for Virtual I/O
Nov 5, 2009
...today's virtualized data center Xsigo Systems, Inc. announced...have encountered major data center connectivity challenges...past twelve months. xsigo_it_survey Xsigo...Channel, iSCSI, 1G Ethernet, or 10G Ethernet...

Greening Data Centers
Nov 1, 2009
...kind in the U.S.—a LEED Platinum data center. Designed to withstand a direct...Regardless of the setting, if the data center goes down, operations at just about any...ACT located its new $3.5 million data center at a satellite location, retaining...

PTS Data Center Solutions Expands Data Center Education Series
Nov 19, 2009
...State / Province Select Country First City / Town Select State First PTS Data Center Solutions Expands Data Center Education Series PTS Data Center Solutions, a leading data center and computer room consulting services firm...

Tech giants push the green data center
Nov 3, 2009
...Michel Tech giants push the green data center November 3, 2009 In catching...came across an announcement about a data center of the future project from T-systems...2020. The partners aim to improve data center energy and cooling efficiency by measuring...