Case Studies
Microsoft Word - Pre-cast concrete - FOR PUBLICATION - 8 page.doc
WAS 003-003: Offsite Construction Case Study Waste Reduction Potential of Precast concrete Manufactured Offsite Precast concrete manufactured off-site negates the need for temporary works and reduces material wastage resulting in a more efficient use of material. Project code: WAS 003.003 ISBN:
Microsoft Word - High temp fans Ferrari.doc
BSRIA Limited Old Bracknell Lane West, Bracknell, Berkshire RG12 7AH UK T: +44 (0)1344 465600 F: +44 (0)1344 465626 E: bsria@bsria.co.uk W: www.bsria.co.uk CASE STUDY TESTING HIGH TEMPERATURE FANS Case study 5 Domestic co-generation (proton exchange membrane) BSRIA CONTACT: Product testing T:
New River Village, Hornsey, London | Case studies | CABE
Skip to navigation Skip to content CABE The government's advisor on architecture, urban design and public space Register Login Help for professionals Map Feedback Contact us Search Search site Enter your search term Search section Home
Professional development through inter-disciplinary and inter-professional learning activities
Case Study Banner Professional development through inter-disciplinary and inter-professional learning activities Leeds Metropolitan University School of the Built Environment Brunswick Building, Leeds LS2 8BU Contact: David Pearce Tel: 0113 2832 1703 Email:
London Eye - Case studies - Interserve
Interserve is one of the world's foremost support services and construction companies. We are based in the UK with revenue of £1.9 billion and a workforce of 50,000 people worldwide.
Bubbletecture H :: Constructalia
An environmental education centre in Japan with a Cypress wood structure covered with weather resistance steel.
Microsoft Word - VOLUMETRIC - FOR PUBLICATION - 8 page.doc
WAS 003-003: Offsite Construction Case Study Waste Reduction Potential of Offsite Volumetric Construction Volumetric offsite construction reduces the production of waste to 1.8% through efficient design, continuous process improvement, involvement of the supply chain as well as procurement
Microsoft Word - Case study B - HD Final 160908
Case study Food Waste Collection Trials – collections of weekly food waste in high density housing areas Photo: Food waste collection trial in Calderdale During 2007-08 WRAP provided support to 19 local authorities to carry out separate food waste collection trials. This case study presents the
Case study template
Plasterboard case study Plasterboard waste minimisation and management Image – Nightingale Associates, Architects This case study describes the approaches taken to minimise and manage plasterboard waste during a major PFI development project at Ipswich Hospital. Plasterboard waste minimisation
Microsoft Word - Case Study - Recycled gypsum in a novel cementitious material.doc
Plasterboard case study Recycled gypsum in a novel cementitious material This case study describes the development of cost effective novel cementitious mixes using recycled gypsum from waste plasterboard and a range of mineral wastes. Trials were undertaken of its use for the construction of
Refine by Topic:
- Compaction Equipment (1)
- Cranes (12)
- Excavators (2)
- Fork Lifts & Tele Handlers (12)
- Light Construction Equipment (1)
- Loaders (1)
- Pumps & Pumping Equipment (1)
Refine by Content Type:
Refine by Source:
- www.wrap.org.uk (5)
- sectors.interserve.com (3)
- www.cabe.org.uk (3)
- www.constructalia.com (3)
- www.interserve.com (2)
- cebe.cf.ac.uk (1)
- www.bsria.co.uk (1)

