Case Studies
Aggregates case study template
Plasterboard Case Study British Gypsum take-back scheme: • Battersea Reach, London - St George South London • Queen Elizabeth Hospital, Gateshead - AMEC Design & Project Services, Project type 1 Battersea Reach, mixed use development Location Wandsworth, London Date Phase 1: 2003 – mid 2005
Computer Aided Learning within a Building Technology module
Case Study Banner Computer Aided Learning within a Building Technology module Loughborough University, Civil and Building Engineering Department, Ashby Road, Loughborough, Leicestershire, LE11 3TU Contact: Julian Mackenzie Tel: 01509 228794 Email:
032ÐLOWERAE
The achievement LoweRae Architects is a practice of eleven employees and a turnover of around £350,000. They recently replaced their IT systems with a new eleven station Windows NT network incorporating network e-mail, domain name, Internet access and web site. At the same time they replaced
Health - Case studies - Interserve
Interserve Skip to content > Advanced search Home About Interserve Our strategy Board of directors Vision, goals, values Our history Our locations Case studies Awards and accreditations Staff communications Sectors Aviation Central government
Design process - Grove Village | Case studies | CABE
Skip to navigation Skip to content CABE The government's advisor on architecture, urban design and public space Register Login Map Contact us Search Search site Enter your search term Search section Home About CABE Resources Areas of work
Portsmouth City Council - Case studies - Interserve
Interserve is one of the world's foremost support services and construction companies. We are based in the UK with revenue of £1.9 billion and a workforce of 50,000 people worldwide.
Falklands water treatment - Case studies - Interserve
Interserve The Trusted Partner Advanced search Falklands water treatment The strategic brief was to provide Project and cost management skills to upgrade the existing water treatment works for the next 20 years. Interserve was engaged to provide the following
Project saves company materials and costs
Accessibility Links Skip to content Skip to Envirowise search Disable Flash Titles Help Envirowise Logo - Sustainable Practices, Sustainable Profits Advice line: 0800 585794 Home Our Services Topics & Issues Sectors Search Envirowise All UK
Microsoft Word - Case study answers 240309.doc
24/03/2009 Case study answers 240309.doc Case study and scenarios The following fictitious case study has been used at the WRAP Halving Waste to Landfill Workshops as part of an exercise to encourage delegates to consider the appropriate actions at both a company and a project level that will
3782 Skanska Case study
Case study: Measuring Net Waste Skanska Whitfield School, Bristol Analysing the Net Waste of a school To help achieve Government policy goals for waste, sustainable construction and green procurement, WRAP (Waste & Resources Action Programme) has developed the Net Waste method. This management
Refine by Topic:
- Building Cost Data & Trends (9)
- Construction Software (6)
- Construction Technology (1)
- Project Financing (15)
- SubContracting (8)
Refine by Content Type:
Refine by Source:
- sectors.interserve.com (12)
- www.constructingexcellence.org.uk (11)
- www.interserve.com (5)
- www.wrap.org.uk (4)
- cebe.cf.ac.uk (3)
- local-government.interserve.com (2)
- education.interserve.com (1)
- justice.interserve.com (1)
- www.cabe.org.uk (1)
- www.envirowise.gov.uk (1)

