Featured Suppliers:

Post a company profile and network.
Meet people, view photos, and more!
Free Corporate Team Building DVD.
Team Building Seminar with Results.
From a Top Home Designer/Remodeler.
Free Estimate. 20 Yrs Experience.

Sponsored Links


 

Sponsored Links

Contractor

Find Five-Star Rated Contractors & Get Free, Competing Bids!

www.ServiceMagic.com

Newland Construction Inc.

Building and Remodeling in Orange County, Ca for over 20 years.

www.NewlandConstructionInc.com

 

Keller GE - Keller Ground Engineering, Case Histories, soil nailing, slope stabilisation

As part of the design and construction of a new slip road of the M11 at Stansted Airport, May Gurney Construction Ltd required the design of a series of retaining walls. KGE proposed the replacement of these walls with a soil nail vegetated solution.

http://www.keller-ge.co.uk/engineering/case-studies/case-study-details/M11A120StanstedSlipRoadSoilNailingFacingWorks.html?ContentID=41&PHPSESSID=791c97a77ad34239c09ee8b6206810fa

Diamond Windows - Our Portfolio

The headquarters for Groom Construction was built up by the very company that is housed in it. While Groom Construction manages and operates the property there are a number of other businesses leasing out space. 9200 Fixed and 9400 Project In HC rated windows were used in this project.

http://www.diamondwindows.com/case_study_9.html

Keller GE - Keller Ground Engineering, Case Histories, soil nailing, slope stabilisation

Some 10 years ago, Keller carried out a vibroreplacement contract for a new warehouse for for Kesslers in Carpenters Lane, Stratford. this area of course is in the heart of not only the main venue but is also close to the proposed Stratford City Development.

http://www.keller-ge.co.uk/engineering/case-studies/case-study-details/Beckton.html?ContentID=51&PHPSESSID=791c97a77ad34239c09ee8b6206810fa

Keller GE - Keller Ground Engineering, Case Histories, soil nailing, slope stabilisation

As part of the design and construction of a new road embankment, Carillion Construction Ltd required the design of a temporary retaining wall. KGE proposed the utilisation of a soil nail and sprayed concrete wall. This offered both cost and programme savings to the Client.

http://www.keller-ge.co.uk/engineering/case-studies/case-study-details/A249SheernessToStockburyM2Improvements.html?ContentID=34&PHPSESSID=791c97a77ad34239c09ee8b6206810fa

Keller GE - Keller Ground Engineering, Case Histories, soil nailing, slope stabilisation

As part of the redevelopment of the Strood Waterfront area, a permanently tied new build sheet pile wall was proposed. The original support scheme consisted of a complicated layout of tie bars to facilitate the curved nature of the 154 metre length of wall.

http://www.keller-ge.co.uk/engineering/case-studies/case-study-details/PermanentGroundAnchorsatStroodWaterfrontRochesterUponMedway.html?ContentID=31&PHPSESSID=791c97a77ad34239c09ee8b6206810fa

Sponsored Links

Vermont Designer/Builder

Custom Construction of New Homes, Remodeling and Custom Cabinets

www.johnparkerconstruction.com

Construction Contractors

Directory of Building Contractors. The Online Business Directory.

www.business.com

 

Keller GE - Keller Ground Engineering, Case Histories, soil nailing, slope stabilisation

Work has just begun on a project for Rosemound to treat up to 2 metres of made ground for the Construction of warehouses just off Lea Bridge Road,Leyton.

http://www.keller-ge.co.uk/engineering/case-studies/case-study-details/Leyton.html?ContentID=50&PHPSESSID=791c97a77ad34239c09ee8b6206810fa

Keller GE - Keller Ground Engineering, Case Histories, soil nailing, slope stabilisation

As part of the construction of a new Press Shop at the Land Rover Plant in Solihull, the Client required to excavate into an existing slope on the site. The original proposals were for a conventional contiguous piled wall.

http://www.keller-ge.co.uk/engineering/case-studies/case-study-details/SoilNailandSprayedShotcreteWallattheLandRoverPressShopSolihull.html?ContentID=5&PHPSESSID=791c97a77ad34239c09ee8b6206810fa

Keller GE - Keller Ground Engineering, Case Histories, soil nailing, slope stabilisation

Almost 6,700 piles were required to support the main structures at Connah s Quay CCGT Power Station. Keller were subsequently awarded several separate contracts to install additional piles beneath the ancillary structures, the gas reception facility and the gas treatment plant.

http://www.keller-ge.co.uk/engineering/case-studies/case-study-details/ConnahsQuayPowerStation.html?ContentID=15&PHPSESSID=791c97a77ad34239c09ee8b6206810fa

Keller GE - Keller Ground Engineering, Case Histories, soil nailing, slope stabilisation

Reconstruction of the river wall at Hewitts Quay along the River Roding, Barking, East London to enable the construction of a block of four storey residential flats with undercroft car parking.

http://www.keller-ge.co.uk/engineering/case-studies/case-study-details/HewittsQuayBarking.html?ContentID=20&PHPSESSID=791c97a77ad34239c09ee8b6206810fa

Sponsored Links

Construction Forms

Get Results! Forms for all States. Accurate, Simple & Downloadable Now

UsLegalForms.com

Free Construction Website

Construction Businesses/Contractors Totally No-Cost to You!

www.BreakoutUSA.com

Contractor Builders Info

Get Info On Contractor Builders. Access 10 Search Engines At Once.

www.Info.com/ContractorBuilders

 

Results 1-9 of 9