Sort by:
ordered by relevance and dateSponsored Links
Newland Construction Inc.
Building and Remodeling in Orange County, Ca for over 20 years.
Keller GE - Keller Ground Engineering, Case Histories, soil nailing, slope stabilisation
As part of the design and construction of a new slip road of the M11 at Stansted Airport, May Gurney Construction Ltd required the design of a series of retaining walls. KGE proposed the replacement of these walls with a soil nail vegetated solution.
Diamond Windows - Our Portfolio
The headquarters for Groom Construction was built up by the very company that is housed in it. While Groom Construction manages and operates the property there are a number of other businesses leasing out space. 9200 Fixed and 9400 Project In HC rated windows were used in this project.
Keller GE - Keller Ground Engineering, Case Histories, soil nailing, slope stabilisation
Some 10 years ago, Keller carried out a vibroreplacement contract for a new warehouse for for Kesslers in Carpenters Lane, Stratford. this area of course is in the heart of not only the main venue but is also close to the proposed Stratford City Development.
Keller GE - Keller Ground Engineering, Case Histories, soil nailing, slope stabilisation
As part of the design and construction of a new road embankment, Carillion Construction Ltd required the design of a temporary retaining wall. KGE proposed the utilisation of a soil nail and sprayed concrete wall. This offered both cost and programme savings to the Client.
Keller GE - Keller Ground Engineering, Case Histories, soil nailing, slope stabilisation
As part of the redevelopment of the Strood Waterfront area, a permanently tied new build sheet pile wall was proposed. The original support scheme consisted of a complicated layout of tie bars to facilitate the curved nature of the 154 metre length of wall.
Sponsored Links
Vermont Designer/Builder
Custom Construction of New Homes, Remodeling and Custom Cabinets
Construction Contractors
Directory of Building Contractors. The Online Business Directory.
Keller GE - Keller Ground Engineering, Case Histories, soil nailing, slope stabilisation
Work has just begun on a project for Rosemound to treat up to 2 metres of made ground for the Construction of warehouses just off Lea Bridge Road,Leyton.
Keller GE - Keller Ground Engineering, Case Histories, soil nailing, slope stabilisation
As part of the construction of a new Press Shop at the Land Rover Plant in Solihull, the Client required to excavate into an existing slope on the site. The original proposals were for a conventional contiguous piled wall.
Keller GE - Keller Ground Engineering, Case Histories, soil nailing, slope stabilisation
Almost 6,700 piles were required to support the main structures at Connah s Quay CCGT Power Station. Keller were subsequently awarded several separate contracts to install additional piles beneath the ancillary structures, the gas reception facility and the gas treatment plant.
Keller GE - Keller Ground Engineering, Case Histories, soil nailing, slope stabilisation
Reconstruction of the river wall at Hewitts Quay along the River Roding, Barking, East London to enable the construction of a block of four storey residential flats with undercroft car parking.
Sponsored Links
Construction Forms
Get Results! Forms for all States. Accurate, Simple & Downloadable Now
Free Construction Website
Construction Businesses/Contractors Totally No-Cost to You!
Contractor Builders Info
Get Info On Contractor Builders. Access 10 Search Engines At Once.
Results 1-9 of 9
Page:

