Case Studies

 

Aggregates case study template

Plasterboard Case Study British Gypsum take-back scheme: • Battersea Reach, London - St George South London • Queen Elizabeth Hospital, Gateshead - AMEC Design & Project Services, Project type 1 Battersea Reach, mixed use development Location Wandsworth, London Date Phase 1: 2003 – mid 2005

Hotel Tresanton, St Mawes, Cornwall | Case studies | CABE

Skip to navigation Skip to content CABE The government's advisor on architecture, urban design and public space Register Login Help for professionals Map Feedback Contact us Search Search site Enter your search term Search section Home

Energy case studies - Case studies - Interserve

Interserve is one of the world's foremost support services and construction companies. We are based in the UK with revenue of £1.9 billion and a workforce of 50,000 people worldwide.

Interserve | Sustainability | Minimising Nuisance

Minimising Nuisance Why did we do this? When Interserve won the contract for a major shopping centre refurbishment programme to give the centre a new and exiting look, the retailers affected were concerned about potential fall in sales. A traditional tube and fittings structure would

Efficient design and plant - Case studies - Interserve

Interserve Skip to content > Advanced search Home About Interserve Our strategy Board of directors Vision, goals, values Our history Our locations Case studies Awards and accreditations Staff communications Sectors Aviation Central government

Cast Stone - Regency Ashlar - Crewe Hall Hotel - Forticrete

A respected leader in the field of Architectural Masonry, Cast Stone and Walling Stone and a recognised Innovator in Concrete Roof Tiles and retaining wall systems and supplier of common blocks.

St. Stephen’s development, Hull - Case studies - Interserve

Interserve The Trusted Partner Advanced search St. Stephen’s development, Hull Retail scheme, St Stephen's Development in Hull Facts and figures Value is £160 million 40-acre city centre brownfield site, one of the most significant regeneration projects

Consulting-Specifying Engineer: Steam plant decentralization project

Consulting-Specifying Engineer is the industry's premier integrated construction engineering resource for commercial, institutional, and industrial building systems.

Seven stories, Newcastle upon Tyne | Case studies | CABE

The imaginative Seven Stories building combines old and new to create a dynamic centre for the celebration of children's literature. Designed by GWK Architects.

Microsoft Word - Cardiff CC 8 page FINAL.doc

WAS006-002: Demolition Exemplar Case Study Recycling Demolition arisings at Cardiff City Centre Despite time and programme constraints imposed by the competitive tender process, 98% of the demolition arisings were recycled. Project code: WAS006-002 ISBN: 1-84405-361-X Research date: April 2007

Results 1-10 of 76
 

Refine by Topic:



Refine by Content Type:

  • Refined by: Case Studies  


Refine by Source:

11 Sources ...