Sort by:
ordered by relevance and dateSponsored Links
Metal Chip Processing
Systems to process/transport bulk scrap metal chips or turnings.
Harris Environmental - Schering-Plough Case Study
The client had a requirement to place a sterile suite of research and pilot production clean rooms in a small area of a new building. The architectural engineering firm suggested that a clean room specialist be engaged to provide a complete installation.
Harris Environmental - Kopin Corporation Case Study
The client operates in a leased structure where no equipment can be installed on the roof. There is limited floor space for mechanical equipment and the total slab to steel dimension is 16 feet, where most clean rooms of this class require a clear height in excess of 20 feet.
Results 1-2 of 2
Page:

