Sponsored Links
Fuel Design
Web Sites

Total : 2 View more »
GetConnected, Inc.
Contact Us | Client Login GetConnected, Inc. - Home Merchant Solutions Provider Solutions Partners News Company Search: MILESTONES PRESS RELEASES MARKET NEWS Interested in Learning More? Press Releases April 23, 2007 GCi to Enable Premium Digital Content and Services to Sling Media s Slingbox
GetConnected, Inc.
BOSTON, Mass., March 2, 2007 -- GetConnected™, Inc., developer of the market-leading transaction processing platform enabling the sale of digital services, today announced it will hold an engineering career fair at its Boston headquarters on March 5, 2007.
News from Zibb.com
Total : 5 View more »
Thorium Power Enters Into New Agreement With Russia's Kurchatov Institute - Zibb.com
MCLEAN, VA, Sep 29, 2008 (MARKET WIRE via COMTEX) --
Thorium Power, Ltd. (OTCBB: THPW), the leading developer of non-proliferative, low waste nuclear fuel technology and a key provider of comprehensive advisory services, today announced a significant milestone as the company has signed a Post-Irradiation Examination (PIE) agreement with the Kurchatov Institute, one of Russia's premier nuclear research facilities.
Following several years of ampoule irradiation testing in Kurchatov Institute's IR-8 research reactor, irradiated uranium-zirconium metal seed fuel samples of Thorium Power's proprietary fuel design have been cooled and will be examined using both non-destructive and destructive methods of post-irradiation examination in accordance with standard industry protocols. This important work will further confirm the fuel performance and provide key irradiation testing data required for regulatory licensing of Thorium Power's fuel designs. The agreement will give Thorium Power access to additional world-class nuclear fuel analysis capabilities.
Seth Grae, the CEO of Thorium Power, stated, "We are tremendously encouraged by the continued process of testing and verification of our fuel design. Our work to develop an innovative proliferation-resistant, low waste alternative to current fuel designs is recognized by both Russia and the United States as an important objective. We have worked collaboratively and successfully in Russia over the past fifteen years under the auspices of the U.S. government and the new agreement allows us to continue this cooperation into additional areas."
Andrey Mushakov, the Executive Vice President for International Nuclear Operations of Thorium Power, further stated, "This milestone is an example of our long and successful collaboration with the Kurchatov Institute. The post-irradiation examination to be conducted will provide additional verification of the safety, efficiency and proliferation resistance of Thorium Power's proprietary fuel designs. This procedure is a significant step forward toward commercial reactor demonstrations and the subsequent regulatory licensing of our fuel designs for pressurized water reactors."
About Thorium Power, Ltd.
Thorium Power (OTCBB: THPW) is a pioneering U.S. nuclear energy company based in McLean, VA. The Company develops non-proliferative nuclear fuel technology and provides comprehensive advisory services for emerging nuclear programs based on a philosophy of transparency, non-proliferation, safety and operational excellence. Thorium Power's technologies, which are aimed at both existing and future reactors, include nuclear fuel designs optimized to address key concerns regarding traditional nuclear power, including proliferation of weapons usable nuclear materials and reduction of nuclear waste. The Company maintains a seasoned team with unparalleled experience from the nuclear energy industry, regulatory and government affairs, non-proliferation and diplomacy. It leverages those broad and integrated capabilities by offering consulting and strategic advisory services to commercial entities and governments with a need to establish or expand nuclear industry capabilities and infrastructure. Thorium Power also maintains long-standing relationships with leading Russian nuclear entities, providing expert resources and facilities for its nuclear fuel development activities. The Company enters into partnerships with participants in the global nuclear industry, allowing it to address a wide range of international opportunities.
DISCLAIMER
This press release may include certain statements that are not descriptions of historical facts, but are forward-looking statements. These forward-looking statements may include the description of our plans and objectives for future operations, assumptions underlying such plans and objectives, statements regarding benefits of new agreements and other statements identified by forward-looking terminology such as "may," "expects," "believes," "anticipates," "intends," "expects," "projects" or similar terms, variations of such terms or the negative of such terms. There are a number of risks and uncertainties that could cause actual results to differ materially from the forward-looking statements made herein. Such information is based upon various assumptions made by, and expectations of, our management that were reasonable when made but may prove to be incorrect. All of such assumptions are inherently subject to significant economic and competitive uncertainties and contingencies beyond our control and upon assumptions with respect to the future business decisions which are subject to change. Accordingly, there can be no assurance that actual results will meet expectations and actual results may vary (perhaps materially) from certain of the results anticipated herein. Reference is made to the risk factors contained in our latest annual report as filed with the Securities and Exchange Commission. These factors may cause actual results to vary from the forward-looking statements contained in this release.
Further information is available on Thorium Power, Ltd.'s website at http://www.thoriumpower.com
CONTACT: Thorium Power, Ltd. Peter Charles (571)730-1200 Email Contact
SOURCE: Thorium Power
http://www2.marketwire.com/mw/emailprcntct?id=97EC4F816FA92A18
Tags: annual report business commercial consulting diplomacy email energy government nuclear nuclear power nuclear waste president research russia technology virginia water weapons
Companies: Thorium Power Ltd (THPW)
Thorium Power Enters into New Agreement with Russia's Kurchatov Institute - Zibb.com
MCLEAN, Va., Sep 29, 2008 (BUSINESS WIRE) --
Thorium Power, Ltd. (OTCBB:THPW), the leading developer of non-proliferative, low waste nuclear fuel technology and a key provider of comprehensive advisory services, today announced a significant milestone as the company has signed a Post-Irradiation Examination (PIE) agreement with the Kurchatov Institute, one of Russia's premier nuclear research facilities.
Following several years of ampoule irradiation testing in Kurchatov Institute's IR-8 research reactor, irradiated uranium-zirconium metal seed fuel samples of Thorium Power's proprietary fuel design have been cooled and will be examined using both non-destructive and destructive methods of post-irradiation examination in accordance with standard industry protocols. This important work will further confirm the fuel performance and provide key irradiation testing data required for regulatory licensing of Thorium Power's fuel designs. The agreement will give Thorium Power access to additional world-class nuclear fuel analysis capabilities.
Seth Grae, the CEO of Thorium Power, stated, "We are tremendously encouraged by the continued process of testing and verification of our fuel design. Our work to develop an innovative proliferation-resistant, low waste alternative to current fuel designs is recognized by both Russia and the United States as an important objective. We have worked collaboratively and successfully in Russia over the past fifteen years under the auspices of the US government and the new agreement allows us to continue this cooperation into additional areas."
Andrey Mushakov, the Executive Vice President for International Nuclear Operations of Thorium Power further stated, "This milestone is an example of our long and successful collaboration with the Kurchatov Institute. The post-irradiation examination to be conducted will provide additional verification of the safety, efficiency and proliferation resistance of Thorium Power's proprietary fuel designs. This procedure is a significant step forward toward commercial reactor demonstrations and the subsequent regulatory licensing of our fuel designs for pressurized water reactors."
About Thorium Power, Ltd.
Thorium Power (OTCBB:THPW) is a pioneering U.S. nuclear energy company based in McLean, VA. The Company develops non-proliferative nuclear fuel technology and provides comprehensive advisory services for emerging nuclear programs based on a philosophy of transparency, non-proliferation, safety and operational excellence. Thorium Power's technologies, which are aimed at both existing and future reactors, include nuclear fuel designs optimized to address key concerns regarding traditional nuclear power, including proliferation of weapons usable nuclear materials and reduction of nuclear waste. The Company maintains a seasoned team with unparalleled experience from the nuclear energy industry, regulatory and government affairs, non-proliferation and diplomacy. It leverages those broad and integrated capabilities by offering consulting and strategic advisory services to commercial entities and governments with a need to establish or expand nuclear industry capabilities and infrastructure. Thorium Power also maintains long-standing relationships with leading Russian nuclear entities, providing expert resources and facilities for its nuclear fuel development activities. The Company enters into partnerships with participants in the global nuclear industry, allowing it to address a wide range of international opportunities.
DISCLAIMER
This press release may include certain statements that are not descriptions of historical facts, but are forward-looking statements. These forward-looking statements may include the description of our plans and objectives for future operations, assumptions underlying such plans and objectives, statements regarding benefits of new agreements and other statements identified by forward-looking terminology such as "may," "expects," "believes," "anticipates," "intends," "expects," "projects" or similar terms, variations of such terms or the negative of such terms. There are a number of risks and uncertainties that could cause actual results to differ materially from the forward-looking statements made herein. Such information is based upon various assumptions made by, and expectations of, our management that were reasonable when made but may prove to be incorrect. All of such assumptions are inherently subject to significant economic and competitive uncertainties and contingencies beyond our control and upon assumptions with respect to the future business decisions which are subject to change. Accordingly, there can be no assurance that actual results will meet expectations and actual results may vary (perhaps materially) from certain of the results anticipated herein. Reference is made to the risk factors contained in our latest annual report as filed with the Securities and Exchange Commission. These factors may cause actual results to vary from the forward-looking statements contained in this release.
Further information is available on Thorium Power, Ltd.'s website at http://www.thoriumpower.com
SOURCE: Thorium Power, Ltd.
Thorium Power, Ltd. Peter Charles, 571-730-1200 ir@thoriumpower.com
Tags: annual report business commercial consulting diplomacy energy government nuclear nuclear power nuclear waste president research russia technology virginia water weapons
Companies: Thorium Power Ltd (THPW)
Notice of Availability of Draft Global Nuclear Energy Partnership Programmatic Environmental Impact
Oct 17, 2008 (FIND, Inc. via COMTEX) --
SUMMARY: The Department of Energy (DOE) announces the availability of the Draft Global Nuclear Energy Partnership Programmatic Environmental Impact Statement (Draft GNEP PEIS, DOE/EIS-0396). The Draft GNEP PEIS provides an analysis of the potential environmental consequences of the reasonable alternatives to support expansion of domestic and international nuclear energy production while reducing the risks associated with nuclear proliferation and reducing the impacts associated with spent nuclear fuel disposal (e.g., by reducing the volume, thermal output, and/or radiotoxicity of waste requiring geologic disposal). Based on the GNEP PEIS and other information, DOE could decide to support the demonstration and deployment of changes to the existing commercial nuclear fuel cycle in the United States. Alternatives analyzed include the existing open fuel cycle and various alternative closed and open fuel cycles. In an open (or once-through) fuel cycle, nuclear fuel is used in a power plant one time and the resulting spent nuclear fuel is stored for eventual disposal in a geologic repository. In a closed fuel cycle, spent nuclear fuel would be recycled to recover energy-bearing components for use in new nuclear fuel.
Six programmatic domestic alternatives are assessed: No Action Alternative--Existing Once-Through Uranium Fuel Cycle (open fuel cycle); Fast Reactor Recycle Fuel Cycle Alternative (closed fuel cycle); Thermal/Fast Reactor Recycle Fuel Cycle Alternative (closed fuel cycle); Thermal Reactor Recycle Fuel Cycle Alternative (closed fuel cycle); Once-Through Fuel Cycle Alternative using Thorium (open fuel cycle); and Once-Through Fuel Cycle Alternative using Heavy Water Reactors (HWRs) or High Temperature Gas-Cooled Reactors (HTGRs) (open fuel cycle). DOE's preference is to close the nuclear fuel cycle, although it has not yet identified a specific preferred alternative.
DATES: DOE invites comments on the Draft GNEP PEIS during the 60-day public comment period, which ends on December 16, 2008. DOE will consider comments received after this date to the extent practicable as it prepares the Final GNEP PEIS. DOE will hold 13 public hearings on the Draft GNEP PEIS. The locations, dates, and times are listed in the SUPPLEMENTARY INFORMATION section.
ADDRESSES: Requests for additional information on the Draft GNEP PEIS, including requests for copies of the document, should be directed to: Mr. Francis G. Schwartz, GNEP PEIS Document Manager, Office of Nuclear Energy, U.S. Department of Energy, 1000 Independence Avenue, SW., Washington, DC 20585, or by telephone: 866-645-7803. Written comments on the Draft GNEP PEIS should be submitted to the above address, by facsimile to 866-489-1891, or electronically through http://www.regulations.gov. Instructions for commenting at http://www.regulations.gov are included in the SUPPLEMENTARY INFORMATION section. Please mark correspondence "Draft GNEP PEIS Comments." Additional information on GNEP may be found at http://www.gnep.energy.gov.
For general information regarding the DOE NEPA process contact: Ms. Carol M. Borgstrom, Director, Office of NEPA Policy and Compliance, GC-20, U.S. Department of Energy, 1000 Independence Avenue, SW., Washington, DC 20585, telephone 202-586-4600, or leave a message at 1-800-472-2756. Additional information regarding DOE NEPA activities and access to many of DOE's NEPA documents are available on the Internet through the DOE NEPA Web site at http://www.gc.energy.gov/NEPA.
SUPPLEMENTARY INFORMATION:
Public Hearings and Invitation to Comment. DOE will hold 13 public hearings on the Draft GNEP PEIS. The hearings will be held at the following locations, dates, and times:
Monday, November 17, 7 p.m., Lea County Event Center, 5101 North Lovington- Hobbs Highway, Hobbs, New Mexico 88240.
Monday, November 17, 7 p.m., Red Lion Hotel, 2525 North 20th Avenue, Pasco, Washington 99301.
Tuesday, November 18, 9 a.m., Pecos River Village Conference Center, Carousel House, 711 Muscatel Avenue, Carlsbad, New Mexico 88220.
Tuesday, November 18, 7 p.m., Eastern New Mexico University-Roswell, Occupational Technology Center, Seminar Room 124, 20 West Mathis, Roswell, New Mexico 88130.
Tuesday, November 18, 7 p.m., Hood River Inn--Gorge Room, 1108 East Marina Way, Hood River, Oregon 97031.
Thursday, November 20, 7 p.m., Hilltop House Best Western, 400 Trinity Drive (at Central), Los Alamos, New Mexico 87544.
Thursday, November 20, 7 p.m., Hilton Garden Inn, 700 Lindsay Boulevard, Idaho Falls, Idaho 83402.
Monday, December 1, 7 p.m., Carson Four Rivers Center, Myre River Room, 100 Kentucky Avenue, Paducah, Kentucky 42003.
Tuesday, December 2, 7 p.m., Vern Riffe Career Technology Center, 175 Beaver Creek Road, Piketon, Ohio 45661.
Tuesday, December 2, 7 p.m., New Hope Center, 602 Scarboro Road, Corner of New Hope and Scarboro Roads, Oak Ridge, Tennessee 37830.
Thursday, December 4, 7 p.m., Holiday Inn Bolingbrook, 205 Remington Boulevard, Bolingbrook, Illinois 60440.
Thursday, December 4, 7 p.m., Aiken Technical College, Building 700-- Amphitheater, 2276 Jefferson Davis Highway, Graniteville, South Carolina 29829.
Tuesday, December 9, 1 p.m., Holiday Inn Capitol, 550 C Street, SW., Washington, DC 20024.
Individuals who would like to present comments orally at these hearings must register upon arrival at the hearing. DOE will allot two to five minutes, depending upon the number of speakers, to each individual wishing to speak so as to ensure that as many people as possible have the opportunity to speak. More time may be allotted by the hearing moderator as circumstances allow. An open house will begin one hour prior to the start of each public hearing. DOE officials will be available to discuss the Draft GNEP PEIS and answer questions during this open house. DOE will then hold a plenary session at each public hearing in which officials will explain the Draft GNEP PEIS and the analyses in it. Following the plenary session, the public will have an opportunity to provide oral and written comments. Oral comments from the hearings and written comments submitted during the comment period will be considered by DOE in preparing the Final GNEP PEIS. Comments submitted after the close of the comment period will be considered to the extent practicable.
The Draft GNEP PEIS, references and additional information regarding the GNEP Program are available on the Internet at http://www.gnep.energy.gov. In addition, the Draft GNEP PEIS is available on the Internet at http://www.regulations.gov and on the DOE
[Page Number 61846]
NEPA Web site at http://www.gc.energy.gov/NEPA.
To Comment Electronically on the Internet. Visit http://www.regulations.gov. From the home page of regulations.gov, under "More Search Options" in the right column of the Web page, select "Go." This loads a new Web page titled "More Search Options." In the middle column is an option to "Search by Agency." Type "DOE" and select "Go." The left column of the new page lists options to "Narrow Results." Under "Comment Period," select "Open" and this will display all DOE documents available for public comment. Select DOE Global Nuclear Energy Partnership Programmatic Environmental Impact Statement. You can view the document in Adobe Acrobat (.pdf) or HTML format.
To submit comments on the GNEP PEIS, select "Send a Comment or Submission" under the title. On the "Public Comment and Submission Form," enter your name, address, and other requested information. This information will be used to compile the distribution list for the Final GNEP PEIS. You can type your comments in the "General Comments" box provided on the comment form. There is no limit to the number of characters that you can type in this box. You also can attach electronic files with your text comments. To view the file types accepted by regulations.gov, select "Learn More" below the General Comments box. You can attach as many files as you wish. Regulations.gov will show a message when you have successfully uploaded a file. Individual submissions are limited to 10MB (10,000KB). To submit files greater than 5MB, please compress the attached file(s) using file compression software or submit each attachment separately using multiple submissions. After completing the form and including any attachments, you must select "Next Step," under "Action" at the bottom of the Web page, in order for your comments to be submitted to DOE.
The Draft GNEP PEIS and references are available for review by the public at the DOE Reading Rooms and public libraries listed below:
U.S. Department of Energy, FOIA/Privacy Act Group, 1000 Independence Avenue, SW., Washington, DC 20585, Phone: (202) 586-3142.
Carlsbad Field Office, U.S. Department of Energy, WIPP Information Center, 4021 National Parks Highway, P.O. Box 2078, Carlsbad, New Mexico 88220, Phone: 1-800-336-WIPP.
Chicago Operations Office, U.S. Department of Energy, Office of Science Public Reading Room, Document Department, University Library, The University of Illinois at Chicago, 801 South Morgan Street, 3rd Floor Center, Chicago, Illinois 60607, DOE Contact: Gary Pitchford, Phone: (630) 252-2013.
Idaho Operations Office, U.S. Department of Energy, Public Reading Room, 1776 Science Center Drive, Idaho Falls, Idaho 83415-2300, Reading Room Contact: Gail Willmore, Phone: (208) 526-9162.
Paducah Gaseous Diffusion Plant, Department of Energy, Environmental Information Center and Reading Room, 115 Memorial Drive, Barkley Centre, Paducah, Kentucky 42001, Phone: (270) 554-6979.
Los Alamos Site Office, LANL Research Library, Technical Area 3, Building 207, Los Alamos, New Mexico 87545, Phone: (505) 667-5809.
Oak Ridge Operations Office, DOE Oak Ridge Information Center, 475 Oak Ridge Turnpike, Oak Ridge, Tennessee 37830, Phone: (865) 241-4780 or (toll-free) 1(800) 382-6938, option 6.
Richland Operations Office, U.S. Department of Energy, Public Reading Room, MSIN H2-53, P.O. Box 999, Richland, Washington 99352, Contact: Terri Traub, Phone: (509) 372-7443.
Savannah River Operations Office, U.S. Department of Energy, Public Reading Room, 471 University Parkway, Aiken, South Carolina 29801, Contact: Paul Lewis, Phone: (803) 641-3320.
Albuquerque Operations Office, FOIA Reading Room and DOE Reading Rooms, Government Information Department, Zimmerman Library, University of New Mexico, Albuquerque, New Mexico 87131-1466, Contact: Dan Barkley, Phone: (505) 277-7180.
Portsmouth Gaseous Diffusion Plant, Department of Energy, Environmental Information Center, 1862 Shyville Road, Room 220, Piketon, Ohio 45661.
Background
The Global Nuclear Energy Partnership (GNEP), a part of the President's Advanced Energy Initiative, is intended to support a safe, secure, and sustainable expansion of nuclear energy, both domestically and internationally. Domestically, the GNEP Program would promote technologies that support economic, sustained production of nuclear-generated electricity, while reducing the impacts associated with spent nuclear fuel disposal and reducing proliferation risks. DOE envisions changing the U.S. nuclear energy fuel cycle from an open (or once-through) fuel cycle--in which nuclear fuel is used in a power plant one time and the resulting spent nuclear fuel is stored for eventual disposal in a geologic repository--to a closed fuel cycle, in which spent nuclear fuel would be recycled to recover energy-bearing components for use in new nuclear fuel. Internationally, the U.S., through the GNEP Program, is considering various initiatives to work cooperatively with other nations to expand nuclear power to help meet growing energy demand, develop and deploy advanced nuclear recycling and reactor technologies, establish international frameworks to provide nuclear fuel supplies, and promote the development of nuclear safeguards and of more proliferation- resistant nuclear power reactors.
On March 22, 2006, DOE published an Advance Notice of Intent for the Global Nuclear Energy Partnership Technology Demonstration Program Environmental Impact Statement in the Federal Register (71 FR 14505). The Advance Notice of Intent explained the goals of the GNEP Program, three major elements of the then-proposed GNEP Technology Demonstration Program, and the purpose and need for action, and presented a list of potential environmental issues for analysis. In the notice, DOE solicited comments on the proposed scope, alternatives, and environmental issues to be analyzed in the then-planned GNEP Technology Demonstration EIS. DOE received about 800 comment documents, including comments that DOE should prepare a PEIS addressing the entire GNEP Program, not just the GNEP Technology Demonstration Program.
On August 3, 2006, DOE announced that it would issue financial assistance grants to public or commercial entities interested in hosting GNEP facilities (DOE, "Financial Assistance Funding Opportunity Announcement Global Nuclear Energy Partnership (GNEP) Siting Studies," Funding Opportunity Number: DE- PS07-06ID14760). DOE reviewed the resulting grant applications and on January 30, 2007, issued grants to 11 commercial and public consortia to conduct siting studies for hosting an advanced nuclear fuel recycling center and/or an advanced recycling reactor.
On January 4, 2007, DOE published the Notice of Intent for the GNEP PEIS in the Federal Register (72 FR 331). That Notice of Intent explained the scope of the revised GNEP Program, identified the alternatives that were then proposed for evaluation, described the purpose and need for action, identified potential sites that could host GNEP Program facilities (including
[Page Number 61847]
those sites addressed by the siting study grants), and listed potential environmental issues for analysis. Subsequent to the Notice of Intent, DOE held public scoping meetings near the sites that were under consideration and in Washington, DC.
DOE received approximately 14,000 comment letters/e-mails and oral comments related to the scope of the GNEP PEIS. The major scoping comments related to the purpose and need, the alternatives that were being considered, the various resource areas that should be addressed in the PEIS, and proliferation risk.
In response to public comments and as the programmatic analysis developed, DOE determined that to make project-specific or site-specific decisions regarding any of the three originally proposed facilities would be premature. The programmatic decisions to be made would influence the size and type of facilities required for implementing an alternative fuel cycle (the originally proposed nuclear fuel recycling center and advanced recycling reactor) as well as the facility needed to support research, development, and deployment (an Advanced Fuel Cycle Facility). As a result, no project-specific or site- specific proposals are being made at this time.
The GNEP PEIS assesses the following six domestic programmatic alternatives:
No Action Alternative--Existing Once-Through Uranium Fuel Cycle: The United States would continue to rely upon a once-through or "open" fuel cycle, in which commercial light water reactors (LWRs) generate and store SNF until DOE could accept the SNF for disposal in a geologic repository.
Fast Reactor Recycle Fuel Cycle Alternative: The United States would pursue a domestic closed fuel cycle in a system that processes LWR SNF in one or more nuclear fuel recycling centers and would recycle some of the recovered materials in one or more fast reactors. The SNF from the advanced recycling reactors (i.e., fast reactors) would also be processed to recover materials for repeated recycle in advanced recycling reactors. High-level wastes (HLW) from separations would be disposed of in a geologic repository.
Thermal/Fast Reactor Recycle Fuel Cycle Alternative: This closed fuel cycle alternative would be similar to the Fast Reactor Recycle Alternative, but it would recycle some of the recovered materials in thermal reactors prior to recycling in advanced recycling reactors. HLW from separations would be disposed of in a geologic repository.
Thermal Reactor Recycle Fuel Cycle Alternative: The United States would pursue a domestic closed fuel cycle that processes LWR SNF and recycles some of the recovered materials in thermal reactors. The following three options are assessed: Option 1--Recycle LWR SNF to produce a mixed oxide uranium plutonium (MOX-U-Pu) fuel for use in LWRs; Option 2--Recycle LWR SNF to produce fuel for use in heavy water reactors (HWRs); and Option 3--Recycle LWR SNF to produce a transuranic fuel for use in high temperature gas-cooled reactors (HTGRs). Option 1 would be a closed fuel cycle, in which HLW would be disposed of in a geologic repository. Options 2 and 3, which include recycling of LWR SNF, would dispose of HLW and SNF in a geologic repository.
Once-Through Fuel Cycle Alternative Using Thorium: The United States would pursue a thorium once-through or "open" fuel cycle, in which commercial reactors would be fueled with thorium/uranium-based fuels. Because thorium- based fuels would be compatible with existing LWRs, the Thorium Alternative could also be characterized as representing a "new fuel design." The SNF would be stored until DOE could accept it for disposal in a geologic repository.
Once-Through Fuel Cycle Alternative using Heavy Water Reactors (HWRs) or High Temperature Gas-Cooled Reactors (HTGRs): The United States would pursue a domestic once-through or "open" fuel cycle that uses either HWRs or HTGRs. For the HWR/HTGR Alternative, two options are assessed: Option 1--Use HWRs only; and Option 2--Use HTGRs only. In either case, the SNF would be stored until DOE could accept it for disposal in a geologic repository.
These domestic programmatic alternatives are not mutually exclusive. That is, DOE could decide to pursue implementation of one or more domestic programmatic alternatives.
In general, the analyses in the GNEP PEIS indicate that the closed fuel cycle alternatives offer a greater opportunity, relative to the open fuel cycle alternatives, to reduce the capacity requirements for a future geologic repository, and to reduce the hazards associated with the disposal of spent fuel or high-level radioactive waste. However, the closed fuel cycle alternatives require more disposal capacity for other radioactive wastes than is required under the open fuel cycle alternatives. Furthermore, transportation and associated health impacts from the closed fuel cycle alternatives would be generally higher during the operational period than those from the open fuel cycle alternatives (except for the Once-Through Fuel Cycle using High Temperature Gas-Cooled Reactors).
Following completion of the GNEP PEIS, DOE will be in a position to decide whether to pursue a closed fuel cycle. The GNEP PEIS is a first, important step in deciding whether and how to recycle spent nuclear fuel. A decision to go forward with recycling could trigger additional proposals and research to achieve DOE's programmatic goal. Subsequent DOE policies and actions could also affect decisions by the U.S. commercial utility industry, which would ultimately determine whether and how to implement any changes in the domestic fuel cycle. Any DOE proposals would be subject to appropriate NEPA review.
The PEIS also discusses international aspects of the GNEP Program, but does not evaluate any proposed actions or alternatives. Consequently, DOE would not make any decisions related to international activities based on the GNEP PEIS.
Issued in Washington, DC, on October 10, 2008.
Dennis R. Spurgeon,
Assistant Secretary for Nuclear Energy.
[FR Doc. E8-24669 Filed 10-16-08; 8:45 am]
BILLING CODE 6450-01-P
Vol. 73, No. 202
Notices
Tags: alternative energy billing capitol career college commercial conference department of energy electricity energy environmental impact expansion gasoline government grants health hosting hotel html idaho illinois kentucky library new mexico nuclear nuclear energy nuclear power ohio oregon partnership plant policy power plant radioactive regulations research science software south carolina technology tennessee transportation university utilities washington washington dc water web
Biweekly Notice; Applications and Amendments to Facility Operating Licenses Involving No
Nov 18, 2008 (FIND, Inc. via COMTEX) --
I. Background
Pursuant to section 189a.(2) of the Atomic Energy Act of 1954, as amended (the Act), the U.S. Nuclear Regulatory Commission (the Commission or NRC staff) is publishing this regular biweekly notice. The Act requires the Commission publish notice of any amendments issued, or proposed to be issued and grants the Commission the authority to issue and make immediately effective any amendment to an operating license upon a determination by the Commission that such amendment involves no significant hazards consideration, notwithstanding the pendency before the Commission of a request for a hearing from any person.
This biweekly notice includes all notices of amendments issued, or proposed to be issued from October 23, 2008, to November 5, 2008. The last biweekly notice was published on November 4, 2008 (73 FR 65685).
Notice of Consideration of Issuance of Amendments to Facility Operating Licenses, Proposed No Significant Hazards Consideration Determination, and Opportunity for a Hearing
The Commission has made a proposed determination that the following amendment requests involve no significant hazards consideration. Under the Commission's regulations in 10 CFR 50.92, this means that operation of the facility in accordance with the proposed amendment would not (1) involve a significant increase in the probability or consequences of an accident previously evaluated; or (2) create the possibility of a new or different kind of accident from any accident previously evaluated; or (3) involve a significant reduction in a margin of safety. The basis for this proposed determination for each amendment request is shown below.
The Commission is seeking public comments on this proposed determination. Any comments received within 30 days after the date of publication of this notice will be considered in making any final determination.
Normally, the Commission will not issue the amendment until the expiration of 60 days after the date of publication of this notice. The Commission may issue the license amendment before expiration of the 60-day period provided that its final determination is that the amendment involves no significant hazards consideration. In addition, the Commission may issue the amendment prior to the expiration of the 30-day comment period should circumstances change during the 30-day comment period such that failure to act in a timely way would result, for example, in derating or shutdown of the facility. Should the Commission take action prior to the expiration of either the comment period or the notice period, it will publish in the Federal Register a notice of issuance. Should the Commission make a final No Significant Hazards Consideration Determination, any hearing will take place after issuance. The Commission expects that the need to take this action will occur very infrequently.
Written comments may be submitted by mail to the Chief, Rulemaking, Directives and Editing Branch, Division of Administrative Services, Office of Administration, U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001, and should cite the publication date and page number of this Federal Register notice. Written comments may also be delivered to Room 6D22, Two White Flint North, 11545 Rockville Pike, Rockville, Maryland, from 7:30 a.m. to 4:15 p.m. Federal workdays. Copies of written comments received may be examined at the Commission's Public Document Room (PDR), located at One White Flint North, Public File Area O1F21, 11555 Rockville Pike (first floor), Rockville, Maryland. The filing of requests for a hearing and petitions for leave to intervene is discussed below.
Within 60 days after the date of publication of this notice, person(s) may file a request for a hearing with respect to issuance of the amendment to the subject facility operating license and any person whose interest may be affected by this proceeding and who wishes to participate as a party in the proceeding must file a written request via electronic submission through the NRC E-Filing system for a hearing and a petition for leave to intervene. Requests for a hearing and a petition for leave to intervene shall be filed in accordance with the Commission's "Rules of Practice for Domestic Licensing Proceedings" in 10 CFR Part 2. Interested person(s) should consult a current copy of 10 CFR 2.309, which is available at the Commission's PDR, located at One White Flint North, Public File Area 01F21, 11555 Rockville Pike (first floor), Rockville, Maryland. Publicly available records will be accessible from the Agencywide Documents Access and Management System's (ADAMS) Public Electronic Reading Room on the Internet at the NRC Web site, http://www.nrc.gov/reading-rm/doc-collections/cfr/. If a request for a hearing or petition for leave to intervene is filed within 60 days, the Commission or a presiding officer designated by the Commission or by the Chief Administrative Judge of the Atomic Safety and Licensing Board Panel, will rule on the request and/or petition; and the Secretary or the Chief Administrative Judge of the Atomic Safety and Licensing Board will issue a notice of a hearing or an appropriate order.
As required by 10 CFR 2.309, a petition for leave to intervene shall set forth with particularity the interest of the petitioner in the proceeding, and how that interest may be affected by the results of the proceeding. The petition should specifically explain the reasons why intervention should be permitted with particular reference to the following general requirements: (1) The name, address, and telephone number of the requestor or petitioner; (2) the nature of the requestor's/petitioner's right under the Act to be made a party to the proceeding; (3) the nature and extent of the requestor's/petitioner's property, financial, or other interest in the proceeding; and (4) the possible effect of any decision or order which may be entered in the proceeding on the requestor's/petitioner's interest. The petition must also set forth the specific contentions which the petitioner/requestor seeks to have litigated at the proceeding.
Each contention must consist of a specific statement of the issue of law or fact to be raised or controverted. In addition, the petitioner/requestor shall provide a brief explanation of the bases for the contention and a concise statement of the alleged facts or expert opinion which support the contention and on which the petitioner/requestor intends to rely in proving the contention at the hearing. The petitioner/requestor must also provide references to those specific sources and documents of which the petitioner is aware and on which the petitioner/requestor intends to rely to establish those facts or expert opinion. The petition must include sufficient information to show that a genuine dispute exists with the applicant on a material issue of law or fact. Contentions shall be limited to matters within the scope of the amendment under consideration. The contention must be one which, if proven, would entitle the petitioner/requestor to relief. A petitioner/requestor who fails to satisfy these requirements with respect to at least one
[Page Number 68452]
contention will not be permitted to participate as a party.
Those permitted to intervene become parties to the proceeding, subject to any limitations in the order granting leave to intervene, and have the opportunity to participate fully in the conduct of the hearing.
If a hearing is requested, and the Commission has not made a final determination on the issue of no significant hazards consideration, the Commission will make a final determination on the issue of no significant hazards consideration. The final determination will serve to decide when the hearing is held. If the final determination is that the amendment request involves no significant hazards consideration, the Commission may issue the amendment and make it immediately effective, notwithstanding the request for a hearing. Any hearing held would take place after issuance of the amendment. If the final determination is that the amendment request involves a significant hazards consideration, any hearing held would take place before the issuance of any amendment.
A request for hearing or a petition for leave to intervene must be filed in accordance with the NRC E-Filing rule, which the NRC promulgated in August 28, 2007 (72 FR 49139). The E-Filing process requires participants to submit and serve documents over the internet or in some cases to mail copies on electronic storage media. Participants may not submit paper copies of their filings unless they seek a waiver in accordance with the procedures described below.
To comply with the procedural requirements of E-Filing, at least five (5) days prior to the filing deadline, the petitioner/requestor must contact the Office of the Secretary by e-mail at hearingdocket@nrc.gov, or by calling (301) 415-1677, to request (1) a digital ID certificate, which allows the participant (or its counsel or representative) to digitally sign documents and access the E-Submittal server for any proceeding in which it is participating; and/or (2) creation of an electronic docket for the proceeding (even in instances in which the petitioner/requestor (or its counsel or representative) already holds an NRC-issued digital ID certificate). Each petitioner/requestor will need to download the Workplace Forms Viewer TM to access the Electronic Information Exchange (EIE), a component of the E-Filing system. The Workplace Forms Viewer TM is free and is available at http://www.nrc.gov/site-help/e- submittals/install-viewer.html. Information about applying for a digital ID certificate is available on NRC's public Web site at http://www.nrc.gov/site- help/e-submittals/apply-certificates.html.
Once a petitioner/requestor has obtained a digital ID certificate, had a docket created, and downloaded the EIE viewer, it can then submit a request for hearing or petition for leave to intervene. Submissions should be in Portable Document Format (PDF) in accordance with NRC guidance available on the NRC public Web site at http://www.nrc.gov/site-help/e-submittals.html. A filing is considered complete at the time the filer submits its documents through EIE. To be timely, an electronic filing must be submitted to the EIE system no later than 11:59 p.m. Eastern Time on the due date. Upon receipt of a transmission, the E-Filing system time-stamps the document and sends the submitter an e-mail notice confirming receipt of the document. The EIE system also distributes an e-mail notice that provides access to the document to the NRC Office of the General Counsel and any others who have advised the Office of the Secretary that they wish to participate in the proceeding, so that the filer need not serve the documents on those participants separately. Therefore, applicants and other participants (or their counsel or representative) must apply for and receive a digital ID certificate before a hearing request/petition to intervene is filed so that they can obtain access to the document via the E-Filing system.
A person filing electronically may seek assistance through the "Contact Us" link located on the NRC Web site at http://www.nrc.gov/site-help/e- submittals.html or by calling the NRC technical help line, which is available between 8:30 a.m. and 4:15 p.m., Eastern Time, Monday through Friday. The help line number is (800) 397-4209 or locally, (301) 415-4737.
Participants who believe that they have a good cause for not submitting documents electronically must file a motion, in accordance with 10 CFR 2.302(g), with their initial paper filing requesting authorization to continue to submit documents in paper format. Such filings must be submitted by: (1) First class mail addressed to the Office of the Secretary of the Commission, U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001, Attention: Rulemaking and Adjudications Staff; or (2) courier, express mail, or expedited delivery service to the Office of the Secretary, Sixteenth Floor, One White Flint North, 11555 Rockville, Pike, Rockville, Maryland 20852, Attention: Rulemaking and Adjudications Staff. Participants filing a document in this manner are responsible for serving the document on all other participants. Filing is considered complete by first-class mail as of the time of deposit in the mail, or by courier, express mail, or expedited delivery service upon depositing the document with the provider of the service.
Non-timely requests and/or petitions and contentions will not be entertained absent a determination by the Commission, the presiding officer, or the Atomic Safety and Licensing Board that the petition and/or request should be granted and/or the contentions should be admitted, based on a balancing of the factors specified in 10 CFR 2.309(c)(1)(i)-(viii). To be timely, filings must be submitted no later than 11:59 p.m. Eastern Time on the due date.
Documents submitted in adjudicatory proceedings will appear in NRC's electronic hearing docket which is available to the public at http://ehd.nrc.gov/EHD_Proceeding/home.asp, unless excluded pursuant to an order of the Commission, an Atomic Safety and Licensing Board, or a Presiding Officer. Participants are requested not to include personal privacy information, such as social security numbers, home addresses, or home phone numbers in their filings. With respect to copyrighted works, except for limited excerpts that serve the purpose of the adjudicatory filings and would constitute a Fair Use application, participants are requested not to include copyrighted materials in their submission.
For further details with respect to this amendment action, see the application for amendment which is available for public inspection at the Commission's PDR, located at One White Flint North, Public File Area 01F21, 11555 Rockville Pike (first floor), Rockville, Maryland. Publicly available records will be accessible from the ADAMS Public Electronic Reading Room on the Internet at the NRC Web site, http://www.nrc.gov/reading-rm/adams.html. If you do not have access to ADAMS or if there are problems in accessing the documents located in ADAMS, contact the PDR Reference staff at 1 (800) 397- 4209, (301) 415-4737 or by e-mail to pdr.resource@nrc.gov.
Arizona Public Service Company, et al., Docket Nos. STN 50-528, STN 50-529, and STN 50-530, Palo Verde Nuclear Generating Station, Units 1, 2, and 3, Maricopa County, Arizona
Date of amendment request: October 1, 2008.
[Page Number 68453]
Description of amendment request: The amendment would modify Technical Specification (TS) 5.5.16, Containment Leakage Rate Testing Program, by adding exceptions to Regulatory Guide (RG) 1.163, "Performance-Based Containment Leak-Test Program," that would allow the next integrated leak rate test (ILRT) (Type A test) to be performed at a 15-year interval at Palo Verde Nuclear Generating Station (PVNGS), Units 1, 2, and 3. The proposed amendment is risk- informed and follows the guidance in RG 1.174, "An Approach for Using Probabilistic Risk Assessment in Risk-Informed Decisions on Plant-Specific Changes to the Licensing Basis."
Basis for proposed no significant hazards consideration determination: As required by 10 CFR 50.91(a), the licensee has provided its analysis of the issue of no significant hazards consideration, which is presented below:
1. Does the proposed amendment involve a significant increase in the probability or consequences of an accident previously evaluated?
Response: No.
The proposed change to extend the next ILRT interval from 10 to 15 years one time does not involve a physical change to PVNGS[,] Units 1, 2, and 3, or a change in the manner in which the plant is operated or controlled. The containment vessel is designed to provide an essentially leak-tight barrier against the uncontrolled release of radioactivity to the environment for any postulated accidents. As such, the reactor containment itself and the testing guidelines invoked to periodically demonstrate the integrity of the containment exist to ensure the containment can mitigate the consequences of any accident and do not involve the prevention or identification of any precursors of any accidents. There is no design basis accident that is initiated by a failure of the containment leakage mitigation function. The extension of the ILRT will not create any adverse interactions with other systems that could result in initiation of a design basis accident. Therefore, the probability of occurrence of an accident previously evaluated is not significantly increased.
Based on a completed probability risk assessment of the affects of this change to the ILRT interval there is a slight increase in risk dose. This increase in risk in terms of person-rem year within 50 miles of the plant resulting from design basis accidents is significantly less than one percent and of a magnitude that NUREG-1493 indicates is imperceptible. The risk assessment also analyzed the increase in risk in terms of the frequency of large early releases from accidents. The increase in the large early release frequency resulting from the proposed extension was determined to be within the guidelines published in Regulatory Guide 1.174. Additionally, the proposed change maintains defense-in-depth by preserving a reasonable balance among prevention of core damage, prevention of containment failure, and consequence mitigation. The increase in the conditional containment failure probability from reducing the ILRT frequency from one test per 10 years to one test per 15 years is less than one percent and considered insignificant. Continued containment integrity is assured by the history of successful ILRTs, and the established programs for local leakage rate testing and in-service inspections which are not affected by the proposed change. Therefore, the consequences of an accident previously analyzed are not significantly increased.
In summary, the probability of occurrence and the consequences of an accident previously evaluated are not significantly increased.
2. Does the proposed amendment create the possibility of a new or different kind of accident from any accident previously evaluated?
Response: No.
The proposed change to extend the ILRT interval from 10 to 15 years does not create any new or different accident initiators or precursors. The length of the ILRT interval does not affect the manner in which any accident begins. The proposed change does not physically change the plant, does not create any new failure modes for the containment and does not affect the interaction between the containment and any other system. Thus, the proposed changes do not create the possibility of a new or different kind of accident from any previously evaluated.
3. Does the proposed amendment involve a significant reduction in a margin of safety?
Response: No.
The risk-based margins of safety associated with the containment ILRT are those associated with the estimated person-rem per year, the large early release frequency, and the conditional containment failure probability. The potential effect of the proposed change on the parameters have been quantified and it has been determined that the effect is considered insignificant. The non-risk-based margins of safety associated with the containment ILRT are those involved with its structural integrity and leak tightness. The proposed change to extend the ILRT interval from 10 to 15 years does not adversely affect either of these attributes. The proposed change only affects the frequency at which these attributes are verified. Therefore, the proposed change does not involve a significant reduction in margin of safety. The NRC staff has reviewed the licensee's analysis and, based on that review, it appears that the three standards of 10 CFR 50.92(c) are satisfied. Therefore, the NRC staff proposes to determine that the request for amendments involves no significant hazards consideration.
Attorney for licensee: Michael G. Green, Senior Regulatory Counsel, Pinnacle West Capital Corporation, P.O. Box 52034, Mail Station 8695, Phoenix, Arizona 85072-2034.
NRC Branch Chief: Michael T. Markley.
Entergy Nuclear Operations, Inc., Docket No. 50-155, Big Rock Point Plant, Charleviox County, Michigan
Date of amendment request: September 22, 2008.
Description of amendment request: The proposed amendment would amend the facility operating license by changing the names of the licensees from Entergy Nuclear Operations, Inc., and Entergy Nuclear Palisades, LLC to EquaGen Nuclear LLC and Enexus Nuclear Palisades, LLC, respectively.
Basis for proposed no significant hazards consideration determination: As required by 10 CFR 50.91(a), the licensee has provided its analysis of the issue of no significant hazards consideration, which is presented below:
The proposed amendment would only change the names of the licensees and reflect associated order requirements. The proposed changes do not involve a significant increase in the probability or consequences of an accident previously evaluated. The proposed changes do not create the possibility of a new or different kind of accident from an accident previously evaluated. The proposed changes do not involve a significant reduction in margin of safety. The NRC staff has reviewed the licensee's analysis and, based on this review, it appears that the three standards of 10 CFR 50.92(c) are satisfied. Therefore, the NRC staff proposes to determine that the amendment request involves no significant hazards consideration.
Attorney for licensee: Mr. William Dennis, Assistant General Counsel, Entergy Nuclear Operations, Inc., 440 Hamilton Ave., White Plains, NY 10601.
NRC Branch Chief: Lois M. James.
Entergy Nuclear Operations, Inc., Docket Nos. 50-003, 50-247, and 50-286, Indian Point Nuclear Generating Unit Nos. 1, 2 and 3, Westchester County, New York
Date of amendment request: September 30, 2008 (2 letters).
Description of amendment request: This is an administrative change which would reflect the creation of new companies as approved by the NRC Order dated July 28, 2008. The amendments would not be implemented until the restructuring transactions have been completed. The amendments would revise the names on the plant licenses to match the names of the new companies. Entergy Nuclear Indian Point 2, LLC would be changed to Enexus Nuclear Indian Point 2, LLC. Entergy Nuclear Indian Point 3, LLC
[Page Number 68454]
would be changed to Enexus Nuclear Indian Point 3, LLC. Entergy Nuclear Operations, Inc. would be changed to EquaGen Nuclear LLC.
Basis for proposed no significant hazards consideration determination: As required by 10 CFR 50.91(a), the licensee has provided its analysis of the issue of no significant hazards consideration, which is presented below:
The proposed amendment would only change the names of the licensees and reflect associated order requirements. The proposed changes do not involve a significant increase in the probability or consequences of an accident previously evaluated. The proposed changes do not create the possibility of a new or different kind of accident from any accident previously evaluated. The proposed changes do not involve a significant reduction in a margin of safety. The NRC staff has reviewed the licensee's analysis and, based on this review, it appears that the three standards of 10 CFR 50.92(c) are satisfied. Therefore, the NRC staff proposes to determine that the amendment request involves no significant hazards consideration.
Attorney for licensee: Mr. William C. Dennis, Assistant General Counsel, Entergy Nuclear Operations, Inc., 440 Hamilton Avenue, White Plains, NY 10601.
NRC Branch Chief: Mark G. Kowal.
Entergy Nuclear Operations, Inc., Docket No. 50-255, Palisades Plant, Van Buren County, Michigan
Date of amendment request: September 22, 2008.
Description of amendment request: The proposed amendment would amend the renewed facility operating license and Technical Specifications Design Features, Section 4, by changing the names of the licensees from Entergy Nuclear Operations, Inc. and Entergy Nuclear Palisades, LLC to EquaGen Nuclear LLC and Enexus Nuclear Palisades, LLC, respectively.
Basis for proposed no significant hazards consideration determination: As required by 10 CFR 50.91(a), the licensee has provided its analysis of the issue of no significant hazards consideration, which is presented below:
The proposed amendment would only change the names of the licensees and reflect associated order requirements. The proposed changes do not involve a significant increase in the probability or consequences of an accident previously evaluated. The proposed changes do not create the possibility of a new or different kind of accident from an accident previously evaluated. The proposed changes do not involve a significant reduction in margin of safety. The NRC staff has reviewed the licensee's analysis and, based on this review, it appears that the three standards of 10 CFR 50.92(c) are satisfied. Therefore, the NRC staff proposes to determine that the amendment request involves no significant hazards consideration.
Attorney for licensee: Mr. William Dennis, Assistant General Counsel, Entergy Nuclear Operations, Inc., 440 Hamilton Ave., White Plains, NY 10601.
NRC Branch Chief: Lois M. James.
Entergy Nuclear Vermont Yankee, LLC and Entergy Nuclear Operations, Inc., Docket No. 50-271, Vermont Yankee Nuclear Power Station, Vernon, Vermont
Date of amendment request: September 22, 2008.
Description of amendment request: The proposed amendment would relocate the contents of the Vermont Yankee (VY) Technical Specification (TS) relating to the Reactor Building crane to the VY Technical Requirements Manual (TRM).
Basis for proposed no significant hazards consideration determination: As required by 10 CFR 50.91(a), the licensee has provided its analysis of the issue of no significant hazards consideration which is presented below:
1. The operation of Vermont Yankee Nuclear Power Station (VY) in accordance with the proposed amendment will not involve a significant increase in the probability or consequences of an accident previously evaluated.
This proposed change relocates the VY TS and associated Bases related to the Reactor Building crane to the VY TRM. The proposed amendment does not impact the operability of any structure, system or component that affects the probability of an accident or that supports mitigation of an accident previously evaluated. The proposed amendment does not affect reactor operations or accident analysis and has no radiological consequences. The operability requirements for accident mitigation systems remain consistent with the licensing and design basis. Therefore, the proposed amendment does not involve a significant increase in the probability or consequences of an accident previously evaluated.
2. The operation of Vermont Yankee Nuclear Power Station (VY) in accordance with the proposed amendment will not create the possibility of a new or different kind of accident from any accident previously evaluated.
This proposed change relocates the VY TS and associated Bases related to the Reactor Building crane to the VY TRM. The proposed amendment does not change the design or function of any component or system. No new modes of failure or initiating events are being introduced. Therefore, operation of VY in accordance with the proposed amendment will not create the possibility of a new or different kind of accident from any accident previously evaluated.
3. The operation of Vermont Yankee Nuclear Power Station (VY) in accordance with the proposed amendment will not involve a significant reduction in a margin of safety.
This proposed change relocates the VY TS and associated Bases related to the Reactor Building crane to the VY TRM. The proposed amendment does not change the design or function of any component or system. The proposed amendment does not involve any safety limits, safety settings or safety margins. The ability of the Reactor Building crane to perform its intended functions will continue to be required in accordance with the VY TRM.
Since the proposed controls are adequate to ensure the operability of the Reactor Building crane, there will still be high assurance that the components are operable and capable of performing their respective functions. Therefore, operation of VY in accordance with the proposed amendment will not involve a significant reduction in [a] margin to safety.
The NRC staff has reviewed the licensee's analysis and, based on this review, it appears that the three standards of 10 CFR 50.92(c) are satisfied. Therefore, the NRC staff proposes to determine that the amendment request involves no significant hazards consideration.
Attorney for licensee: Mr. William C. Dennis, Assistant General Counsel, Entergy Nuclear Operations, Inc., 400 Hamilton Avenue, White Plains, NY 10601.
NRC Branch Chief: Mark G. Kowal.
Entergy Nuclear Vermont Yankee, LLC and Entergy Nuclear Operations, Inc., Docket No. 50-271, Vermont Yankee Nuclear Power Station, Vernon, Vermont
Date of amendment request: September 22, 2008.
Description of amendment request: The proposed amendment would revise the Technical Specification (TS) to change requirements related to Battery Systems specified in TS Section 3.10 resulting in removing the Limiting Condition for Operation pertaining to 345 kV switchyard batteries, chargers and associated direct current distribution panel.
Basis for proposed no significant hazards consideration determination: As required by 10 CFR 50.91(a), the licensee has provided its analysis of the issue of no significant hazards consideration which is presented below:
1. Does the proposed change involve a significant increase in the probability or consequences of an accident previously evaluated?
Response: No.
The change does not impact the function of any Structure, System or Component (SSC)
[Page Number 68455]
that affects the probability of an accident or that supports mitigation or consequences of an accident previously evaluated. The proposed change removes unnecessary information from the Technical Specifications that is not required in accordance with 10 CFR 50.36. The proposed change does not affect any plant equipment operation or accident analysis and has no radiological consequences. Therefore, the proposed change does not involve a significant increase in the probability or consequences of an accident previously evaluated.
2. Does the proposed change create the possibility of a new or different kind of accident from any accident previously evaluated?
Response: No.
The proposed change does not involve any physical alteration of plant equipment and does not change the method by which any safety related system performs their function. The proposed change removes unnecessary information from the Technical Specifications that is not required in accordance with 10 CFR 50.36. As such, no new or different types of equipment will be installed or removed from the facility. Operation of existing installed equipment is unchanged. Therefore, the proposed change does not create the possibility of a new or different kind of accident from any accident previously evaluated.
3. Does the proposed change involve a significant reduction in a margin of safety?
Response: No.
This change does not change any existing design or operational requirements and does not adversely affect existing plant safety margins or the reliability of the equipment assumed to operate in the safety analysis. As such, there are no changes being made to safety analysis assumptions, safety limits or safety system settings that would adversely affect plant operation as a result of the proposed change. Therefore, the proposed change does not involve a significant reduction in a margin of safety.
The NRC staff has reviewed the licensee's analysis and, based on this review, it appears that the three standards of 10 CFR 50.92(c) are satisfied. Therefore, the NRC staff proposes to determine that the amendment request involves no significant hazards consideration.
Attorney for licensee: Mr. William C. Dennis, Assistant General Counsel, Entergy Nuclear Operations, Inc., 400 Hamilton Avenue, White Plains, NY 10601.
NRC Branch Chief: Mark G. Kowal.
Florida Power Corporation, et al., Docket No. 50-302, Crystal River Unit 3 Nuclear Generating Plant, Citrus County, Florida
Date of amendment request: June 3, 2008.
Description of amendment request: The proposed amendment would revise the analysis methodology in the Final Safety Analysis Report, Section 5.4.3, "Structural Design Criteria," and Section 5.4.5.3, "Missile Analysis." The amendment would allow the licensee to use the yield line theory methodology to qualify the east wall of the Auxiliary Building for tornado wind and missile loading.
Basis for proposed no significant hazards consideration determination: As required by 10 CFR 50.91(a), the licensee has provided its analysis of the issue of no significant hazards consideration, which is presented below:
1. Does not involve a significant increase in the probability or consequences of an accident previously evaluated.
The proposed LAR [license amendment request] will revise the methodology used to qualify the east wall of the CR-3 [Crystal River Unit 3 Nuclear Generating Plant] Auxiliary Building for all expected and postulated loads including tornado wind and missile loading. The Yield Line Theory methodology is an industry standard that is used for the design and analysis of concrete slabs. The Yield Line Theory methodology is used for investigating the failure mechanisms of flat reinforced concrete slabs at the ultimate limit (failure point). In other words, this methodology determines either the moments in a slab at the point of failure or the load at which the slab will fail. A change in the methodology of an analysis used to verify qualification of an existing structure will not have any impact on the probability of accidents previously evaluated.
The analysis performed demonstrates that the CR-3 Auxiliary Building east wall will remain structurally intact following the worst case loadings assumed in the calculation. Therefore, this proposed change does not involve a significant increase in the probability or consequences previously evaluated.
2. Does not create the possibility of a new or different kind of accident from any accident previously evaluated.
The function of the CR-3 Auxiliary Building wall is to house and protect the equipment that is important to safety from damage during normal operation, transients and design basis accidents. The use of the Yield Line Theory methodology for qualifying the east wall of the CR-3 Auxiliary Building has no impact on the capability of the structure. A calculation that uses the Yield Line Theory methodology demonstrated that the structure meets required design criteria. This ensures that the wall is capable of performing its design function without alteration or compensatory actions of any kind. No changes to any plant system, structure, or component (SSC) are proposed. No changes to any plant operating practices, procedures, computer firmware/ software will occur.
Therefore, the proposed change will not create the possibility of a new or different kind of accident from any previously evaluated.
3. Does not involve a significant reduction in a margin on safety.
The design basis of the plant requires structures to be capable of withstanding normal and accident loads including those from a design basis tornado. The Yield Line Theory methodology, as applied in an approved plant calculation, has demonstrated that the east wall of the CR-3 Auxiliary Building is capable of performing its design function. There is a slight reduction in conservatism between the method used for the remaining Class 1 structures, American Concrete Institute (ACI) standard 318-63 and the Yield Line Theory methodology, but the calculation performed with the Yield Line Theory methodology validates the requirement that the east wall of the CR-3 Auxiliary Building will protect the important to safety SSCs located in proximity to the wall from damage.
ACI 318-63 utilizes conservative methods, and due to the assumptions and technique, results in a Code defined value for strength that is not the maximum limit. The Yield Line Theory methodology uses assumptions and techniques that will define the failure point. However, the calculation performed for the east wall of the CR-3 Auxiliary Building demonstrates that there is margin to this "failure point," and the strength of the wall exceeds the applied loads, including the tornado wind and pressure drop loads, and will not fail due to tornado missile impact.
Therefore, the proposed change does not involve a significant reduction in the margin of safety.
The NRC staff has reviewed the licensee's analysis and, based on this review it appears that the three standards of 10 CFR 50.92(c) are satisfied. Therefore, the NRC staff proposes to determine that the amendment request involves no significant hazards consideration.
Attorney for licensee: David T. Conley, Associate General Counsel II--Legal Department, Progress Energy Service Company, LLC, Post Office Box 1551, Raleigh, North Carolina 27602.
NRC Branch Chief: Thomas H. Boyce.
PPL Susquehanna, LLC, Docket Nos. 50-387 and 50-388, Susquehanna Steam Electric Station, Units 1 and 2, Luzerne County, Pennsylvania
Date of amendment request: July 31, 2008.
Description of amendment request: The proposed amendments would change the PPL Susquehanna, LLC (PPL) Units 1 and 2 Technical Specification (TSs) 3.6.1.3 "Primary Containment Isolation Valves (PCIVs)." It proposes to revise the Secondary Containment Bypass Leakage (SCBL) limit in Surveillance Requirement 3.6.1.3.11 from "less than or equal to 9 standard cubic foot/feet per hour (scfh)" to "less than or equal to 15 scfh when pressurized to greater than or equal to P<a>."
Basis for proposed no significant hazards consideration determination:
[Page Number 68456]
As required by 10 CFR 50.91(a), the licensee has provided its analysis of the issue of no significant hazards consideration, which is presented below:
1. Do the proposed changes involve a significant increase in the probability or consequences of an accident previously evaluated?
Response: No.
The structures, systems and components affected by the proposed change act as mitigators to the consequences of accidents. These components are not initiators of any accident analyzed in the Final Safety Analysis Report (FSAR). As such, the proposed change does not increase the probability of an accident previously evaluated. Based on the revised analysis, the proposed change does revise the performance requirement; however, the proposed change does not involve a revision to the parameters or conditions that could contribute to the initiation of a DBA [design-basis accident] discussed in Chapter 15 of the FSAR.
Plant-specific radiological analysis has been performed using the increased Secondary Containment Bypass Leakage (SCBL) limit. This analysis demonstrates that the CRHE [control room habitability envelope] dose consequences meet the regulatory guidance provided for use with the Alternative Source Term (AST), and the offsite doses are well within acceptable limits (10 CFR 50.67, Regulatory Guide (RG) 1.183, and Standard Review Plan Section (SRP) 15.0.1).
Therefore, the proposed amendment does not result in a significant increase in the consequences of any previously evaluated accident.
2. Do the proposed changes create the possibility of a new or different kind of accident from any accident previously evaluated?
Response: No.
The proposed change does not involve a physical alteration of any plant equipment. No new equipment is being introduced, and installed equipment is not being operated in a new or different manner. There are no setpoints, at which protective or mitigative actions are initiated, affected by this change. This change does not alter the manner in which equipment operation is initiated, nor will the function demands on credited equipment be changed. No alterations in the procedures that ensure the plant remains within analyzed limits are being proposed, and no changes are being made to the procedures relied upon to respond to an off-normal event as described in the FSAR. As such, no new failure modes are being introduced. The change does not alter assumptions made in the safety analysis and licensing basis.
Therefore, the proposed changes do not create the possibility of a new or different kind of accident from any previously evaluated.
3. Do the proposed changes involve a significant reduction in a margin of safety?
Response: No.
The results of the revised accident analysis are subject to the acceptance criteria in 10 CFR 50.67. The revised Secondary Containment Bypass Leakage rate limit is used in the LOCA [loss-of-coolant accident] radiological analysis. The analysis has been performed using conservative methodologies. Safety margins and analytical conservatisms have been evaluated and have been found acceptable. The analyzed LOCA event has been carefully selected and margin has been retained to ensure that the analysis adequately bounds postulated event scenarios. The dose consequences of the limiting event is within the acceptance criteria presented in 10 CFR 50.67, RG 1.183, and SRP 15.0.1. The effect of the revision to the Technical Specification requirements has been analyzed and doses resulting from the pertinent design basis accident have been found to remain within regulatory limits. The change continues to ensure that the doses at the exclusion area and low population zone boundaries, as well as the control room, are within the corresponding regulatory limits. Therefore, the proposed change does not involve a significant reduction in a margin of safety.
The NRC staff has reviewed the licensee's analysis and, based on this review, it appears that the three standards of 10 CFR 50.92(c) are satisfied. Therefore, the NRC staff proposes to determine that the amendment request involves no significant hazards consideration.
Attorney for licensee: Bryan A. Snapp, Esquire, Assoc. General Counsel, PPL Services Corporation, 2 North Ninth St., GENTW3, Allentown, PA 18101-1179.
NRC Branch Chief : Mark Kowal.
Tennessee Valley Authority, Docket No. 50-259, Browns Ferry Nuclear Plant, Unit 1, Limestone County, Alabama
Date of amendment request: July 18, 2008.
Description of amendment request: The proposed amendment would revise the Technical Specifications (TS) 2.1.1.2 to decrease the safety limit minimum critical power ratio (SLMCPR) from 1.11 to 1.09 for single recirculation loop operation and from 1.09 to 1.07 for two recirculation loop operation.
Basis for proposed no significant hazards consideration determination: As required by 10 CFR 50.91(a), the licensee has provided its analysis of the issue of no significant hazards consideration, which is presented below:
1. Does the proposed Technical Specification change involve a significant increase in the probability or consequences of an accident previously evaluated?
No. The proposed amendment establishes a revised SLMCPR value for single and two recirculation loop operation. The probability of an evaluated accident is derived from the probabilities of the individual precursors to that accident. The proposed SLMCPR values preserve the existing margin to transition boiling and the probability of fuel damage is not increased. Since the change does not require any physical plant modifications or physically affect any plant components, no individual precursors of an accident are affected and the probability of an evaluated accident is not increased by revising the SLMCPR values.
The consequences of an evaluated accident are determined by the operability of plant systems designed to mitigate those consequences. The revised SLMCPR values have been determined using NRC-approved methods and procedures. The basis of the MCPR Safety Limit is to ensure no mechanistic fuel damage is calculated to occur if the limit is not violated. These calculations do not change the method of operating the plant and have no effect on the consequences of an evaluated accident. Therefore, the proposed TS change does not involve an increase in the probability or consequences of an accident previously evaluated.
2. Does the proposed Technical Specification change create the possibility of a new or different kind of accident from any accident previously evaluated?
No. The proposed license amendment involves a revision of the SLMCPR value for single and two recirculation loop operation based on the results of an analysis of the Unit 1 Cycle 8 core. Creation of the possibility of a new or different kind of accident would require the creation of one or more new precursors of that accident. New accident precursors may be created by modifications of the plant configuration, including changes in the allowable methods of operating the facility. This proposed license amendment does not involve any modifications of the plant configuration or changes in the allowable methods of operation. Therefore, the proposed TS change does not create the possibility of a new or different kind of accident from any accident previously evaluated.
3. Does the proposed Technical Specification change involve a significant reduction in a margin of safety?
No. The margin of safety as defined in the TS bases will remain the same. The new SLMCPR values were calculated using referenced fuel vendor methods and procedures, which are in accordance with the fuel design and licensing criteria. The SLMCPR remains high enough to ensure that greater than 99.9 percent of all fuel rods in the core are expected to avoid transition boiling if the limit is not violated, thereby preserving the fuel cladding integrity. Therefore, the proposed TS change does not involve a reduction in the margin of safety.
The NRC staff has reviewed the licensee's analysis and, based on this review, it appears that the three standards of 10 CFR 50.92(c) are satisfied. Therefore, the NRC staff proposes to determine that the amendment request involves no significant hazards consideration.
Attorney for licensee: General Counsel, Tennessee Valley Authority, 400 West Summit Hill Drive, ET 11A, Knoxville, Tennessee 37902.
[Page Number 68457]
NRC Branch Chief: Thomas H. Boyce.
Notice of Issuance of Amendments to Facility Operating Licenses
During the period since publication of the last biweekly notice, the Commission has issued the following amendments. The Commission has determined for each of these amendments that the application complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act), and the Commission's rules and regulations. The Commission has made appropriate findings as required by the Act and the Commission's rules and regulations in 10 CFR Chapter I, which are set forth in the license amendment.
Notice of Consideration of Issuance of Amendment to Facility Operating License, Proposed No Significant Hazards Consideration Determination, and Opportunity for A Hearing in connection with these actions was published in the Federal Register as indicated.
Unless otherwise indicated, the Commission has determined that these amendments satisfy the criteria for categorical exclusion in accordance with 10 CFR 51.22. Therefore, pursuant to 10 CFR 51.22(b), no environmental impact statement or environmental assessment need be prepared for these amendments. If the Commission has prepared an environmental assessment under the special circumstances provision in 10 CFR 51.22(b) and has made a determination based on that assessment, it is so indicated.
For further details with respect to the action see (1) the applications for amendment, (2) the amendment, and (3) the Commission's related letter, Safety Evaluation and/or Environmental Assessment as indicated. All of these items are available for public inspection at the Commission's Public Document Room (PDR), located at One White Flint North, Public File Area 01F21, 11555 Rockville Pike (first floor), Rockville, Maryland. Publicly available records will be accessible from the Agencywide Documents Access and Management Systems (ADAMS) Public Electronic Reading Room on the internet at the NRC Web site, http://www.nrc.gov/reading-rm/adams.html. If you do not have access to ADAMS or if there are problems in accessing the documents located in ADAMS, contact the PDR Reference staff at 1 (800) 397-4209, (301) 415-4737 or by e-mail to pdr.resource@nrc.gov.
AmerGen Energy Company, LLC, Docket No. 50-461, Clinton Power Station, Unit No. 1, DeWitt County, Illinois
Date of application for amendment: September 27, 2007, as supplemented by letter dated September 5, 2008.
Brief description of amendment: The amendment modified the technical specifications (TS) by relocating references to specific American Society for Testing and Materials standards for fuel oil testing to licensee-controlled documents as part of the implementation of Technical Specification Task Force (TSTF) Traveler No. 374. This proposed change to the standard technical specifications was submitted by the TSTF in TSTF-374, "Revision to TS 5.5.13 and Associated TS Bases for Diesel Fuel Oil," and is applicable to all nuclear power reactors.
Date of issuance: October 30, 2008.
Effective date: As of the date of issuance and shall be implemented within 60 days.
Amendment No.: 182.
Facility Operating License No. NPF-62: The amendment revised the Technical Specifications and License.
Federal Register : December 18, 2007 (72 FR 71705). The September 5, 2008 supplement, contained clarifying information, did not expand the scope of the application as originally noticed, and did not change the NRC staff's original proposed no significant hazards consideration determination.
The Commission's related evaluation of the amendment is contained in a Safety Evaluation dated October 30, 2008.
No significant hazards consideration comments received: No.
Dominion Nuclear Connecticut, Inc., et al., Docket Nos. 50-336 and 50-423, Millstone Power Station, Unit Nos. 2 and 3, New London County, Connecticut
Date of application for amendment: March 25, 2008, as supplemented by letter dated September 30, 2008.
Brief description of amendment: The amendment revises the reactor coolant system (RCS) specific activity to utilize a new indicator, Dose Equivalent Xenon-133 and only take into account the noble gas activity in the primary coolant, instead of using the average disintegration energy (E Bar). Specifically, the Technical Specification 3.4.8, "Specific Activity," limit on RCS gross specific activity has a new limit on RCS noble gas specific activity. The changes are based on Technical Specification Task Force (TSTF) change traveler TSTF-490, "Deletion of E Bar Definition and Revision to RCS Specific Activity Tech. Spec. [Technical Specification]."
Date of issuance: October 27, 2008.
Effective date: As of the date of issuance and shall be implemented within 120 days from the date of issuance.
Amendment Nos.: 307 and 246.
Renewed Facility Operating License Nos. DPR-65 and NPF-49: Amendment revised the License and Technical Specifications.
Federal Register : July 29, 2008 (73 FR 43955-43956). The supplement dated September 30, 2008, provided additional information that clarified the application, did not expand the scope of the application as originally noticed, and did not change the staff's original proposed no significant hazards consideration determination.
The Commission's related evaluation of the amendment is contained in a Safety Evaluation dated October 27, 2008.
No significant hazards consideration comments received: No.
Duke Energy Carolinas, LLC, Docket Nos. 50-269, 50-270, and 50-287, Oconee Nuclear Station, Units 1, 2, and 3, Oconee County, South Carolina
Date of application of amendments: October 16, 2007, as supplemented May 7, September 2 and October 23, 2008.
Brief description of amendments: The amendments revised the Technical Specifications to accommodate plant modifications that address water hammer concerns described in Generic Letter 96-06, "Assurance of Equipment Operability and Containment Integrity During Design-Basis Conditions," dated September 30, 1996.
Date of Issuance: October 29, 2008.
Effective date: As of the date of issuance and shall be implemented within 30 days from the date of issuance.
Amendment Nos.: 363, 365, 364.
Renewed Facility Operating License Nos. DPR-38, DPR-47, and DPR-55: Amendments revised the licenses and the technical specifications.
Federal Register : November 20, 2007 (72 FR 65364). The supplements dated May 7, September 2 and October 23, 2008, provided additional information that clarified the application, did not expand the scope of the application as originally noticed, and did not change the staff's original proposed no significant hazards consideration determination.
The Commission's related evaluation of the amendments is contained in a Safety Evaluation dated October 29, 2008.
[Page Number 68458]
No significant hazards consideration comments received: No.
Duke Energy Carolinas, LLC, Docket Nos. 50-269, 50-270, and 50-287, Oconee Nuclear Station, Units 1, 2, and 3, Oconee County, South Carolina
Date of application of amendments: October 22, 2007, supplemented July 14, September 17, and October 27, 2008.
Brief description of amendments: The amendments revised the Technical Specifications related to accommodate the use of AREVA NP Mark-B-HTP fuel.
Date of Issuance: October 29, 2008.
Effective date: As of the date of issuance and shall be implemented within 30 days from the date of issuance.
Amendment Nos.: 362, 364, 363.
Renewed Facility Operating License Nos. DPR-38, DPR-47, and DPR-55: Amendments revised the licenses and the technical specifications.
Federal Register : November 20, 2007 (72 FR 65365). The supplements dated July 14, September 17, and October 27, 2008, provided additional information that clarified the application, did not expand the scope of the application as originally noticed, and did not change the staff's original proposed no significant hazards consideration determination.
The Commission's related evaluation of the amendments is contained in a Safety Evaluation dated October 29, 2008.
No significant hazards consideration comments received: No.
Entergy Nuclear Operations, Inc., Docket No. 50-247, Indian Point Nuclear Generating Unit No. 2, Westchester County, New York
Date of application for amendment: December 13, 2007, as supplemented by letter dated July 10, 2008.
Brief description of amendment: The amendment revises the Technical Specifications (TSs) by adding three Emergency Core Cooling System (ECCS) valves and removing four ECCS valves from a TS surveillance requirement for checking valve position every 7 days.
Date of issuance: October 29, 2008.
Effective date: As of the date of issuance, and shall be implemented within 30 days.
Amendment No.: 256.
Facility Operating License No. DPR-26: The amendment revised the License and the TSs.
Federal Register : March 25, 2008 (73 FR 15784). The July 10, 2008, supplement provided additional information that clarified the application, did not expand the scope of the application as originally noticed, and did not change the NRC staff's original proposed no significant hazards consideration determination as published in the Federal Register .
The Commission's related evaluation of the amendment is contained in a Safety Evaluation dated October 29, 2008.
No significant hazards consideration comments received: No.
Exelon Generation Company, LLC, Docket Nos. 50-352 and 50-353, Limerick Generating Station, Units 1 and 2, Montgomery County, Pennsylvania
Date of application for amendment: October 19, 2007, supplemented by letters dated March 14, 2008, March 26, 2008, and July 18, 2008.
Brief description of amendment: The amendments consist of changes to the technical specifications of each unit, increasing the allowed surveillance interval for local power range monitor calibrations from 1000 effective full power hours (EFPH) to 2000 EFPH.
Date of issuance: October 28, 2008.
Effective date: As of the date of issuance and shall be implemented within 60 days of issuance.
Amendment Nos.: 195 and 156.
Facility Operating License Nos. NPF-39 and NPF-85. These amendments revised the license and the technical specifications.
Federal Register : July 8, 2008 (73 FR 39055). The supplements dated March 14, 2008, March 26, 2008 and July 18, 2008, provided additional information that clarified the application, did not expand the scope of the application as originally noticed and did not change the NRC staff's original proposed no significant hazards determination.
The Commission's related evaluation of the amendments is contained in a Safety Evaluation dated October 28, 2008.
No significant hazards consideration comments received: No.
Northern States Power Company, Docket No. 50-263, Monticello Nuclear Generating Plant, Wright County, Minnesota
Date of application for amendment: April 4, 2008, as supplemented by letter dated August 6, 2008.
Brief description of amendment: The amendment revised the Technical Specifications by adding a new Limiting Condition for Operation (LCO), LCO 3.0.9. This LCO establishes conditions under which systems would remain operable when required physical barriers are not capable of providing their related support function. This amendment is consistent with approved Technical Specification Task Force (TSTF) Improved Standard Technical Specifications Change Traveler, TSTF-427, Revision 2.
Effective date: As of the date of issuance and shall be implemented within 90 days following startup from the 2009 Refueling Outage.
Amendment No.: 157.
Facility Operating License No. DPR-22. Amendment revised the Technical Specifications.
Federal Register : September 9, 2008 (73 FR 52418).
The Commission's related evaluation of the amendment is contained in a Safety Evaluation dated October 22, 2008.
No significant hazards consideration comments received: None.
Northern States Power Company, Docket Nos. 50-282 and 50-306, Prairie Island Nuclear Generating Plant, Units 1 and 2, Goodhue County, Minnesota
Date of application for amendments: October 29, 2007, as supplemented by letters dated April 24 and June 13, 2008.
Brief description of amendments: The amendments revise the Technical Specifications (TSs) for Prairie Island Nuclear Generating Plants, Units 1 and 2. The amendments revise TS 3.8.1 "AC Sources--Operating" by revising Surveillance Requirement 3.8.1.9 to require the emergency diesel generator 24- hour load test be performed at or below a power factor of 0.85.
Date of issuance: October 21, 2008.
Effective date: As of the date of issuance and shall be implemented within 90 days.
Amendment Nos.: 189, 178.
Facility Operating License Nos. DPR-42 and DPR-60: Amendments revised the Technical Specifications.
Date of initial notice in Federal Register : December 18, 2007 (72 FR 71713). The supplemental letters contained clarifying information and did not change the initial no significant hazards consideration determination, and did not expand the scope of the original Federal Register notice.
The Commission's related evaluation of the amendment is contained in Safety Evaluation dated October 21, 2008.
No significant hazards consideration comments received: No.
Pacific Gas and Electric Company, Docket Nos. 50-275 and 50-323, Diablo Canyon Nuclear Power Plant, Unit Nos. 1 and 2, San Luis Obispo County, California
Date of application for amendments: October 15, 2007, as supplemented by letter dated July 8, 2008.
[Page Number 68459]
Brief description of amendments: The amendments relocate surveillance frequencies of most surveillance tests from the Technical Specifications (TS) to a licensee-controlled document, the Surveillance Frequency Control Program (SFCP). Once relocated, changes to the surveillance frequencies may be made using a risk-informed methodology, Nuclear Energy Institute (NEI) document NEI 04-10 Rev. 1, as specified in the Administrative Controls of the TS. The NRC staff has previously approved NEI 04-10 Rev. 1, as acceptable for referencing in licensing applications.
Date of issuance: October 30, 2008.
Effective date: As of its date of issuance and shall be implemented within 360 days from the date of issuance.
Amendment Nos.: Unit 1-200; Unit 2-201.
Facility Operating License Nos. DPR-80 and DPR-82: The amendments revised the Facility Operating Licenses and Technical Specifications.
Date of initial notice in Federal Register November 20, 2007 (72 FR 65370). The supplement dated July 8, 2008, provided additional information that clarified the application, did not expand the scope of the application as originally noticed, and did not change the staff's original proposed no significant hazards consideration determination as published in the Federal Register .
The Commission's related evaluation of the amendments is contained in a Safety Evaluation dated October 30, 2008.
No significant hazards consideration comments received: No.
South Carolina Electric & Gas Company, South Carolina Public Service Authority, Docket No. 50-395, Virgil C. Summer Nuclear Station, Unit No. 1, Fairfield County, South Carolina
Date of application for amendment: January 17, 2008, as supplemented August 15, 2008.
Brief description of amendment: The amendment will strengthen the control room envelope habitability requirements, adds a new administrative controls program, and adds an additional condition as described in Technical Specification Task Force traveler 448, Revision 3, "Control Room Habitability."
Date of issuance: October 27, 2008.
Effective date: As of the date of issuance and shall be implemented within 90 days.
Amendment No.: 180.
Renewed Facility Operating License No. NPF-12: Amendment revises the Appendix A Technical Specifications and the Appendix C Additional Conditions.
Federal Register February 12, 2008 (73 FR 8071). The supplement dated August 18, 2008, provided clarifying information that did not change the scope of the January 17, 2008, application nor the initial proposed no significant hazards consideration determination.
The Commission's related evaluation of the amendment is contained in a Safety Evaluation dated October 27, 2008.
No significant hazards consideration comments received: No.
STP Nuclear Operating Company, Docket Nos. 50-498 and 50-499, South Texas Project, Units 1 and 2, Matagorda County, Texas
Date of amendment request: October 23, 2007, as supplemented by letter dated May 20, 2008.
Brief description of amendments: The amendments revised the Technical Specifications (TS) to relocate surveillance frequencies of most surveillance tests from the TS to a licensee-controlled surveillance frequency control program (SFCP). Once relocated, the surveillance frequency changes are permitted based on the risk-informed methodology as specified in the Administrative Controls section of the TS.
Date of issuance: October 31, 2008.
Effective date: As of the date of issuance and shall be implemented within 60 days of issuance.
Amendment Nos.: Unit 1-188; Unit 2-175.
Facility Operating License Nos. NPF-76 and NPF-80: The amendments revised the Facility Operating Licenses and Technical Specifications.
Date of initial notice in Federal Register December 18, 2007 (72 FR 71716). The supplemental letter dated May 20, 2008, provided additional information that clarified the application, did not expand the scope of the application as originally noticed, and did not change the staff's original proposed no significant hazards consideration determination as published in the Federal Register .
The Commission's related evaluation of the amendments is contained in a Safety Evaluation dated October 31, 2008.
No significant hazards consideration comments received: No.
Tennessee Valley Authority, Docket Nos. 50-327 and 50-328, Sequoyah Nuclear Plant, Unit Nos. 1 and 2, Hamilton County, Tennessee
Date of amendment request: October 26, 2007.
Description of amendment request: The amendments modify the Technical Specifications (TSs) to establish more effective and appropriate action, surveillance, and administrative requirements related to ensuring the habitability of the control room envelope in accordance with NRC-approved Technical Specification Task Force (TSTF) Standard Technical Specification change traveler TSTF-448, Revision 3, "Control Room Habitability." Specifically, the amendments modify TS 3.7.7, "Control Room Emergency Ventilation System" and TS Section 6, "Administrative Controls." The amendments also add a new license condition regarding initial performance of the new surveillance and assessment requirements of the revised TSs.
Date of issuance: October 28, 2008.
Effective date: As of the date of issuance and shall be implemented within 60 days.
Amendment Nos: 321 and 313.
Facility Operating License Nos. DPR-77 and DPR-79: Amendments revised the license and the TSs.
Federal Register December 4, 2007 (72 FR 68219).
The Commission's related evaluation of the amendments is contained in a Safety Evaluation dated October 28, 2008.
No significant hazards consideration comments received: No.
Union Electric Company, Docket No. 50-483, Callaway Plant, Unit 1, Callaway County, Missouri
Date of application for amendment: October 31, 2007, as supplemented by letters dated February 21, March 7, April 17, May 6, July 10, and August 13, 2008.
Brief description of amendment: The amendment revises Technical Specifications to extend for one time the Completion Times for both essential service water trains and the emergency diesel generators from 72 hours to 14 days. The revision to TS would apply when each train of ESW system is inoperable during respective ESW system piping replacements.
Date of issuance: October 31, 2008.
Effective date: As of its date of issuance and shall be implemented by December 31, 2008.
Amendment No.: 186.
[Page Number 68460]
Facility Operating License No. NPF-30: The amendment revised the Operating License and Technical Specifications.
Federal Register December 31, 2008 (72 FR 74362). The supplements dated February 21, March 7, April 17, May 6, July 10, and August 13, 2008, provided additional information that clarified the application did not expand the scope of the application as originally noticed, and did not change the staff's original proposed no significant hazards consideration determination as published in the Federal Register .
The Commission's related evaluation of the amendment is contained in a Safety Evaluation dated October 31, 2008.
No significant hazards consideration comments received: No.
Dated at Rockville, Maryland, this 6th day of November 2008.
For the Nuclear Regulatory Commission.
Joseph G. Giitter,
Director, Division of Operating Reactor Licensing, Office of Nuclear Reactor Regulation.
[FR Doc. E8-27110 Filed 11-17-08; 8:45 am]
BILLING CODE 7590-01-P
Vol. 73, No. 223
Notices
Tags: accident alabama arizona billing california clinton computer connecticut defense editing e-mail emergency energy environmental impact federal florida gasoline grants illinois law licenses local maryland media michigan minnesota missouri new_york north carolina nuclear nuclear energy nuclear power pennsylvania plant population power plant property publishing regulations security software south carolina standards startup structural tennessee texas tornado unions vermont washington dc water web
Company details

Fuel Design - Filmography, Year, Role - Variety Profiles
Breaking entertainment news, movie reviews, Celebrity photos, Pictures, entertainment industry events, Film festivals, festival news and festival reviews, Oscars, Emmys, Sundance festival, and Hollywood awards. Featuring box office charts, entertainment news archives and more.
News from Zibb.com
- Thorium Power Enters Into New Agreement With Russia's Kurchatov Institute - Zibb.com
- Thorium Power Enters into New Agreement with Russia's Kurchatov Institute - Zibb.com
- Notice of Availability of Draft Global Nuclear Energy Partnership Programmatic Environmental Impact
- Biweekly Notice; Applications and Amendments to Facility Operating Licenses Involving No
Explore in Related Industries
- Fuel Design in:
- Electronics (2)
